DESIGN DEVELOPMENT OF THE WATER SUPPLY WELLS AND METHODS OF THEIR CAPITAL REPAIR

The article presents analysis of shortcomings and benefits of individual techniques for the capital repair of out-of-commission water wells of standard designs. The author considers the capital repair procedure of water well No 3B of Zhodino ‘Severniy’ water supply point by means of installing a rep...

Full description

Bibliographic Details
Main Author: V. V. Ivashechkin
Format: Article
Language:Russian
Published: Belarusian National Technical University 2016-03-01
Series:Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика
Subjects:
Online Access:https://energy.bntu.by/jour/article/view/1002
_version_ 1826556545011286016
author V. V. Ivashechkin
author_facet V. V. Ivashechkin
author_sort V. V. Ivashechkin
collection DOAJ
description The article presents analysis of shortcomings and benefits of individual techniques for the capital repair of out-of-commission water wells of standard designs. The author considers the capital repair procedure of water well No 3B of Zhodino ‘Severniy’ water supply point by means of installing a repair filter of smaller diameter inside the failed one, cushioning the tubular annulus with gravel. It is shown that this kind of repair can be considered a temporary arrangement inasmuch as the water well specific yield and service life period will reduce significantly. For prolongation of the useful life of the water wells, the paper suggests performing preliminary unloading of their filters. The study reveals that the well capital repair by means of extracting the old filter and exchanging it with a new one can be complicated by the column burst along the welding joints working in tension. The performed column strength test demonstrated the fact that the required heave might exceed the welding joint tolerant tensile force owing to considerable friction of the column against the ground. The author arrives at a design equation of the heave required for extracting the production column with the filter applying only the static force. In which they offer to determine frictional force of the mudded filter against the formation from calculating formulae of the supporting power of an augered pile working with pulling loads. For decreasing the heaves via reducing frictional loads of the mudded filter against the formation, an improved design of the water well has been introduced recognized as an invention with the filter capable of downward biasing. Such water well design allows at the filter mud fill in the first instance the entire filtering column to be biased (knocked) down inside a special sleeve placed lower the settler by applying external buffing force, and then only extracting the filtering column out of the well by decreased traction pull. The energy balance equation for vertical displacement of the water well pipe column results in the computation expression for the hammer striking part weight and its drop height during the capital repair of the water well of improved design.
first_indexed 2024-04-10T02:53:30Z
format Article
id doaj.art-b6964fa1326c43619bcd15977e5d0c7f
institution Directory Open Access Journal
issn 1029-7448
2414-0341
language Russian
last_indexed 2025-03-14T08:14:24Z
publishDate 2016-03-01
publisher Belarusian National Technical University
record_format Article
series Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика
spelling doaj.art-b6964fa1326c43619bcd15977e5d0c7f2025-03-02T13:14:25ZrusBelarusian National Technical UniversityИзвестия высших учебных заведений и энергетических объединенний СНГ: Энергетика1029-74482414-03412016-03-0159217518610.21122/1029-7448-2016-59-2-175-186978DESIGN DEVELOPMENT OF THE WATER SUPPLY WELLS AND METHODS OF THEIR CAPITAL REPAIRV. V. Ivashechkin0Belarusian National Technical UniversityThe article presents analysis of shortcomings and benefits of individual techniques for the capital repair of out-of-commission water wells of standard designs. The author considers the capital repair procedure of water well No 3B of Zhodino ‘Severniy’ water supply point by means of installing a repair filter of smaller diameter inside the failed one, cushioning the tubular annulus with gravel. It is shown that this kind of repair can be considered a temporary arrangement inasmuch as the water well specific yield and service life period will reduce significantly. For prolongation of the useful life of the water wells, the paper suggests performing preliminary unloading of their filters. The study reveals that the well capital repair by means of extracting the old filter and exchanging it with a new one can be complicated by the column burst along the welding joints working in tension. The performed column strength test demonstrated the fact that the required heave might exceed the welding joint tolerant tensile force owing to considerable friction of the column against the ground. The author arrives at a design equation of the heave required for extracting the production column with the filter applying only the static force. In which they offer to determine frictional force of the mudded filter against the formation from calculating formulae of the supporting power of an augered pile working with pulling loads. For decreasing the heaves via reducing frictional loads of the mudded filter against the formation, an improved design of the water well has been introduced recognized as an invention with the filter capable of downward biasing. Such water well design allows at the filter mud fill in the first instance the entire filtering column to be biased (knocked) down inside a special sleeve placed lower the settler by applying external buffing force, and then only extracting the filtering column out of the well by decreased traction pull. The energy balance equation for vertical displacement of the water well pipe column results in the computation expression for the hammer striking part weight and its drop height during the capital repair of the water well of improved design.https://energy.bntu.by/jour/article/view/1002water well, capital repair, filtering column, sleeve, hammer, traction pull
spellingShingle V. V. Ivashechkin
DESIGN DEVELOPMENT OF THE WATER SUPPLY WELLS AND METHODS OF THEIR CAPITAL REPAIR
Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика
water well, capital repair, filtering column, sleeve, hammer, traction pull
title DESIGN DEVELOPMENT OF THE WATER SUPPLY WELLS AND METHODS OF THEIR CAPITAL REPAIR
title_full DESIGN DEVELOPMENT OF THE WATER SUPPLY WELLS AND METHODS OF THEIR CAPITAL REPAIR
title_fullStr DESIGN DEVELOPMENT OF THE WATER SUPPLY WELLS AND METHODS OF THEIR CAPITAL REPAIR
title_full_unstemmed DESIGN DEVELOPMENT OF THE WATER SUPPLY WELLS AND METHODS OF THEIR CAPITAL REPAIR
title_short DESIGN DEVELOPMENT OF THE WATER SUPPLY WELLS AND METHODS OF THEIR CAPITAL REPAIR
title_sort design development of the water supply wells and methods of their capital repair
topic water well, capital repair, filtering column, sleeve, hammer, traction pull
url https://energy.bntu.by/jour/article/view/1002
work_keys_str_mv AT vvivashechkin designdevelopmentofthewatersupplywellsandmethodsoftheircapitalrepair