OPTIMIZING THE RESOURCE ALLOCATION OF PROJECT ACTIVITIES USING CRD METHOD

In the process of effective and optimized planning and control, in order to manage the project, it is necessary to consider all the project aspects. Common techniques of project scheduling and control such as CPM and PERT assume unlimited resource availability in project network analysis Developed n...

Full description

Bibliographic Details
Main Authors: عباس Naderpour, مسعود Mofid
Format: Article
Language:fas
Published: Semnan University 2009-12-01
Series:مجله مدل سازی در مهندسی
Subjects:
Online Access:https://modelling.semnan.ac.ir/article_1545_d230c00c1a91ce16c761edcab874b482.pdf
_version_ 1797296692716896256
author عباس Naderpour
مسعود Mofid
author_facet عباس Naderpour
مسعود Mofid
author_sort عباس Naderpour
collection DOAJ
description In the process of effective and optimized planning and control, in order to manage the project, it is necessary to consider all the project aspects. Common techniques of project scheduling and control such as CPM and PERT assume unlimited resource availability in project network analysis Developed networks due to theory derived of this techniques are networks that deal with time optimization of the activities. Consequently in this schedule and control methods, it is possible that during the project performance in some time periods, requirement to one or more resources is higher than the availability level or include more resource fluctuations. It can finally convert the project into an uneconomical project by a negative time and cost trade off or cause considerable deliveries in project performance time. This paper presents a technical method for controlling and optimizing resource allocation to project activities This technique as an extension to the basic CPM and PERT approach presents a simple method for controlling the project schedule of resource allocation by considering their constraints and causes the optimized and efficient distribution of tasks to project levels Finally by avoiding the simultaneous unnecessary use of several activates of a critical resource and by generating efficient levels of resource availability, it optimizes the project approaches.
first_indexed 2024-03-07T22:08:27Z
format Article
id doaj.art-b8b91deede88478787eb5b7d00794540
institution Directory Open Access Journal
issn 2008-4854
2783-2538
language fas
last_indexed 2024-03-07T22:08:27Z
publishDate 2009-12-01
publisher Semnan University
record_format Article
series مجله مدل سازی در مهندسی
spelling doaj.art-b8b91deede88478787eb5b7d007945402024-02-23T18:52:25ZfasSemnan Universityمجله مدل سازی در مهندسی2008-48542783-25382009-12-01519374610.22075/jme.2017.15451545OPTIMIZING THE RESOURCE ALLOCATION OF PROJECT ACTIVITIES USING CRD METHODعباس Naderpourمسعود MofidIn the process of effective and optimized planning and control, in order to manage the project, it is necessary to consider all the project aspects. Common techniques of project scheduling and control such as CPM and PERT assume unlimited resource availability in project network analysis Developed networks due to theory derived of this techniques are networks that deal with time optimization of the activities. Consequently in this schedule and control methods, it is possible that during the project performance in some time periods, requirement to one or more resources is higher than the availability level or include more resource fluctuations. It can finally convert the project into an uneconomical project by a negative time and cost trade off or cause considerable deliveries in project performance time. This paper presents a technical method for controlling and optimizing resource allocation to project activities This technique as an extension to the basic CPM and PERT approach presents a simple method for controlling the project schedule of resource allocation by considering their constraints and causes the optimized and efficient distribution of tasks to project levels Finally by avoiding the simultaneous unnecessary use of several activates of a critical resource and by generating efficient levels of resource availability, it optimizes the project approaches.https://modelling.semnan.ac.ir/article_1545_d230c00c1a91ce16c761edcab874b482.pdfproject controlresource allocationproject levelsunlimited resourceslevels of resource availability
spellingShingle عباس Naderpour
مسعود Mofid
OPTIMIZING THE RESOURCE ALLOCATION OF PROJECT ACTIVITIES USING CRD METHOD
مجله مدل سازی در مهندسی
project control
resource allocation
project levels
unlimited resources
levels of resource availability
title OPTIMIZING THE RESOURCE ALLOCATION OF PROJECT ACTIVITIES USING CRD METHOD
title_full OPTIMIZING THE RESOURCE ALLOCATION OF PROJECT ACTIVITIES USING CRD METHOD
title_fullStr OPTIMIZING THE RESOURCE ALLOCATION OF PROJECT ACTIVITIES USING CRD METHOD
title_full_unstemmed OPTIMIZING THE RESOURCE ALLOCATION OF PROJECT ACTIVITIES USING CRD METHOD
title_short OPTIMIZING THE RESOURCE ALLOCATION OF PROJECT ACTIVITIES USING CRD METHOD
title_sort optimizing the resource allocation of project activities using crd method
topic project control
resource allocation
project levels
unlimited resources
levels of resource availability
url https://modelling.semnan.ac.ir/article_1545_d230c00c1a91ce16c761edcab874b482.pdf
work_keys_str_mv AT ʿbạsnaderpour optimizingtheresourceallocationofprojectactivitiesusingcrdmethod
AT msʿwdmofid optimizingtheresourceallocationofprojectactivitiesusingcrdmethod