Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power Transformers

It is installed that hooking two lines and two transformers at scheme distributing device by voltage 330 sQ «transformers – a buses with joining line through two breakers» and three installed transformer on substations brings about reduction of the factor to unavailability in 18,2 times in contrast...

Full description

Bibliographic Details
Main Authors: M. A. Korotkevich, A. L. Starzhinsky
Format: Article
Language:Russian
Published: Belarusian National Technical University 2012-12-01
Series:Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika
Online Access:https://energy.bntu.by/jour/article/view/180
_version_ 1797879834965180416
author M. A. Korotkevich
A. L. Starzhinsky
author_facet M. A. Korotkevich
A. L. Starzhinsky
author_sort M. A. Korotkevich
collection DOAJ
description It is installed that hooking two lines and two transformers at scheme distributing device by voltage 330 sQ «transformers – a buses with joining line through two breakers» and three installed transformer on substations brings about reduction of the factor to unavailability in 18,2 times in contrast with scheme with two transformers. At connection of the third transformer through two breakers factor to unavailability practically does not change.At connection one of the transformer through two breakers, at one-and-a-half-breaker scheme RU 330 sQ factor to unavailability falls in 6,6 times to scheme RU 330 sQ «transformers – a buses with joining line through two breakers» under three transformers.
first_indexed 2024-04-10T02:55:07Z
format Article
id doaj.art-b91a30daa0cb485090915a10dd022913
institution Directory Open Access Journal
issn 1029-7448
2414-0341
language Russian
last_indexed 2024-04-10T02:55:07Z
publishDate 2012-12-01
publisher Belarusian National Technical University
record_format Article
series Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika
spelling doaj.art-b91a30daa0cb485090915a10dd0229132023-03-13T07:41:48ZrusBelarusian National Technical UniversityIzvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika1029-74482414-03412012-12-0106174Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power TransformersM. A. Korotkevich0A. L. Starzhinsky1Белорусский национальный технический университетБелорусский национальный технический университетIt is installed that hooking two lines and two transformers at scheme distributing device by voltage 330 sQ «transformers – a buses with joining line through two breakers» and three installed transformer on substations brings about reduction of the factor to unavailability in 18,2 times in contrast with scheme with two transformers. At connection of the third transformer through two breakers factor to unavailability practically does not change.At connection one of the transformer through two breakers, at one-and-a-half-breaker scheme RU 330 sQ factor to unavailability falls in 6,6 times to scheme RU 330 sQ «transformers – a buses with joining line through two breakers» under three transformers.https://energy.bntu.by/jour/article/view/180
spellingShingle M. A. Korotkevich
A. L. Starzhinsky
Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power Transformers
Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika
title Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power Transformers
title_full Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power Transformers
title_fullStr Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power Transformers
title_full_unstemmed Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power Transformers
title_short Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power Transformers
title_sort estimation to practicability of the building substation by voltage 330 sq with three power transformers
url https://energy.bntu.by/jour/article/view/180
work_keys_str_mv AT makorotkevich estimationtopracticabilityofthebuildingsubstationbyvoltage330sqwiththreepowertransformers
AT alstarzhinsky estimationtopracticabilityofthebuildingsubstationbyvoltage330sqwiththreepowertransformers