Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power Transformers
It is installed that hooking two lines and two transformers at scheme distributing device by voltage 330 sQ «transformers – a buses with joining line through two breakers» and three installed transformer on substations brings about reduction of the factor to unavailability in 18,2 times in contrast...
Main Authors: | M. A. Korotkevich, A. L. Starzhinsky |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2012-12-01
|
Series: | Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika |
Online Access: | https://energy.bntu.by/jour/article/view/180 |
Similar Items
-
Conditions ($S_q$) and ($G_q$) on graded rings
by: La Barbiera, M
Published: (2006-11-01) -
Three-phase power transformer modelling in AC/DC traction substations
by: Bulucea Cornelia A., et al.
Published: (2019-01-01) -
Reliability Indicators of Urban Electric Network Schemes for Supply of Second and Third Category Consumers
by: M. A. Korotkevich, et al.
Published: (2012-10-01) -
Control Configurations for Reactive Power Compensation at the Secondary Side of the Low Voltage Substation by Using Hybrid Transformer
by: Mohammed Radi, et al.
Published: (2021-01-01) -
ON THE ISSUE OF DESIGN OF GROUNDING SYSTEMS OF 330(220) KV SUBSTATIONS TO ENSURE THE ELECTROMAGNETIC COMPATIBILITY OF SECONDARY CIRCUITS
by: O. Yu. Glebov, et al.
Published: (2018-10-01)