Enhanced Flexible Ramping Product Formulation for Alleviating Capacity Shortage in Look-ahead Commitment
The roll-out of a flexible ramping product provides independent system operators (ISOs) with the ability to address the issues of ramping capacity shortage. ISOs procure flexible ramping capability by committing more generating units or reserving a certain amount of headrooms of committed units. In...
Main Authors: | Hyeongon Park, Bing Huang, Ross Baldick |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2022-01-01
|
Series: | Journal of Modern Power Systems and Clean Energy |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/9775024/ |
Similar Items
-
Assessment of the Modeling of Demand Response as a Dispatchable Resource in Day-Ahead Hydrothermal Unit Commitment Problems: The Brazilian Case
by: Rosane Santos, et al.
Published: (2022-05-01) -
Unit commitment considering the impact of deep cycling
by: HyungSeon Oh
Published: (2020-01-01) -
UAV Path Planning for Reconnaissance and Look-Ahead Coverage Support for Mobile Ground Vehicles
by: Herath M. P. C. Jayaweera, et al.
Published: (2021-07-01) -
An EM LWD Tool for Deep Reading Looking-Ahead
by: Pengfei Liang, et al.
Published: (2023-01-01) -
Adaptive Cruise Control with Look-Ahead Anticipation for Driving on Freeways
by: Md Abdus Samad Kamal, et al.
Published: (2022-01-01)