Decommissioning cost estimation for a multiple reactor site with interdependent plants: case study using a new management tool and top-down approach
In the end of operational life, a nuclear power plant should be decommissioned to release its site for a new purpose. The decommissioning cost estimation is part of the decommissioning plan, which also include the decommissioning strategy definition. The cost estimation is performed by management t...
Main Authors: | Deiglys Borges Monteiro, João Manoel Lousada Moreira, José Rubens Maiorino |
---|---|
Format: | Article |
Language: | English |
Published: |
Brazilian Radiation Protection Society (Sociedade Brasileira de Proteção Radiológica, SBPR)
2021-02-01
|
Series: | Brazilian Journal of Radiation Sciences |
Subjects: | |
Online Access: | https://bjrs.org.br/revista/index.php/REVISTA/article/view/1404 |
Similar Items
-
Bottom-Up or Top-Down, both Required Commitment
by: Renny Sukmono, et al.
Published: (2019-05-01) -
Evaluation of the decommissioning fund for a nuclear power plant in Brazil
by: Deiglys Borges Monteiro, et al.
Published: (2022-12-01) -
Simulation of stead-state and transient of slow loss of cooling accident of a channel in a plate type fuel element reactor
by: Deiglys Borges Monteiro, et al.
Published: (2022-10-01) -
Thermal-hydraulics validation of CFD code for light water nuclear reactors against benchmark experimental results
by: Deiglys Borges Monteiro, et al.
Published: (2021-07-01) -
Decommissioning cost estimation considering the activities facilitation due remote-controlled equipment
by: Deiglys Borges Monteiro, et al.
Published: (2022-12-01)