Peningkatan Produktivitas Pada Proses Produksi Pracetak Dengan Penerapan Metode Lean Construction Untuk Eliminasi Waste
PT. X is one of the largest precast concrete industry in Indonesia, where to realize the vision, they continue to develop products and improve productivity performance by trying to improve quality of service, production process, and delivery product to customer with minimal cost and on time. To reac...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Brawijaya
2018-02-01
|
Series: | Rekayasa Sipil |
Subjects: | |
Online Access: | http://rekayasasipil.ub.ac.id/index.php/rs/article/view/451 |
_version_ | 1818611086570553344 |
---|---|
author | Yunita Dwi Setyastuti Sri Murni Dewi Agus Suharyanto |
author_facet | Yunita Dwi Setyastuti Sri Murni Dewi Agus Suharyanto |
author_sort | Yunita Dwi Setyastuti |
collection | DOAJ |
description | PT. X is one of the largest precast concrete industry in Indonesia, where to realize the vision, they continue to develop products and improve productivity performance by trying to improve quality of service, production process, and delivery product to customer with minimal cost and on time. To reach that purpose, needed Lean Construction method to eliminate waste and identify activities that can affect the products value-added.Research begins with description of the company's condition using Value Stream Mapping. Waste was identified by questionnaires, then analyzed by selection of mapping tools on Value Stream Analysis Tools and analyzed the root cause for suggestion of improvement. The results showed that the most critical waste that affectted productivity were defects (37.50%), unnecessary inventory (25%), and inappropiate processing (15%). Lead time required for overall of the process was 479.56 minutes and after improvement was reduced to 463.83 minutes by unification T.III / T.IV (fixing and tightening of the bolt plate) which reduced non-value added 15.73 minutes. |
first_indexed | 2024-12-16T15:24:44Z |
format | Article |
id | doaj.art-bb4743a08add4dc093eda6fccc169919 |
institution | Directory Open Access Journal |
issn | 1978-5658 2502-6348 |
language | English |
last_indexed | 2024-12-16T15:24:44Z |
publishDate | 2018-02-01 |
publisher | University of Brawijaya |
record_format | Article |
series | Rekayasa Sipil |
spelling | doaj.art-bb4743a08add4dc093eda6fccc1699192022-12-21T22:26:32ZengUniversity of BrawijayaRekayasa Sipil1978-56582502-63482018-02-0111318619310.21776/ub.rekayasasipil/2017.011.03.3366Peningkatan Produktivitas Pada Proses Produksi Pracetak Dengan Penerapan Metode Lean Construction Untuk Eliminasi WasteYunita Dwi Setyastuti0Sri Murni Dewi1Agus Suharyanto2Program Magister Teknik Sipil Fakultas Teknik, Universitas BrawijayaJurusan Teknik Sipil Fakultas Teknik Universitas BrawijayaJurusan Teknik Sipil Fakultas Teknik Universitas BrawijayaPT. X is one of the largest precast concrete industry in Indonesia, where to realize the vision, they continue to develop products and improve productivity performance by trying to improve quality of service, production process, and delivery product to customer with minimal cost and on time. To reach that purpose, needed Lean Construction method to eliminate waste and identify activities that can affect the products value-added.Research begins with description of the company's condition using Value Stream Mapping. Waste was identified by questionnaires, then analyzed by selection of mapping tools on Value Stream Analysis Tools and analyzed the root cause for suggestion of improvement. The results showed that the most critical waste that affectted productivity were defects (37.50%), unnecessary inventory (25%), and inappropiate processing (15%). Lead time required for overall of the process was 479.56 minutes and after improvement was reduced to 463.83 minutes by unification T.III / T.IV (fixing and tightening of the bolt plate) which reduced non-value added 15.73 minutes.http://rekayasasipil.ub.ac.id/index.php/rs/article/view/451Lean ConstructionValue Stream MappingValue Stream Analysis ToolsCritical WasteLead TimeUnification Process |
spellingShingle | Yunita Dwi Setyastuti Sri Murni Dewi Agus Suharyanto Peningkatan Produktivitas Pada Proses Produksi Pracetak Dengan Penerapan Metode Lean Construction Untuk Eliminasi Waste Rekayasa Sipil Lean Construction Value Stream Mapping Value Stream Analysis Tools Critical Waste Lead Time Unification Process |
title | Peningkatan Produktivitas Pada Proses Produksi Pracetak Dengan Penerapan Metode Lean Construction Untuk Eliminasi Waste |
title_full | Peningkatan Produktivitas Pada Proses Produksi Pracetak Dengan Penerapan Metode Lean Construction Untuk Eliminasi Waste |
title_fullStr | Peningkatan Produktivitas Pada Proses Produksi Pracetak Dengan Penerapan Metode Lean Construction Untuk Eliminasi Waste |
title_full_unstemmed | Peningkatan Produktivitas Pada Proses Produksi Pracetak Dengan Penerapan Metode Lean Construction Untuk Eliminasi Waste |
title_short | Peningkatan Produktivitas Pada Proses Produksi Pracetak Dengan Penerapan Metode Lean Construction Untuk Eliminasi Waste |
title_sort | peningkatan produktivitas pada proses produksi pracetak dengan penerapan metode lean construction untuk eliminasi waste |
topic | Lean Construction Value Stream Mapping Value Stream Analysis Tools Critical Waste Lead Time Unification Process |
url | http://rekayasasipil.ub.ac.id/index.php/rs/article/view/451 |
work_keys_str_mv | AT yunitadwisetyastuti peningkatanproduktivitaspadaprosesproduksipracetakdenganpenerapanmetodeleanconstructionuntukeliminasiwaste AT srimurnidewi peningkatanproduktivitaspadaprosesproduksipracetakdenganpenerapanmetodeleanconstructionuntukeliminasiwaste AT agussuharyanto peningkatanproduktivitaspadaprosesproduksipracetakdenganpenerapanmetodeleanconstructionuntukeliminasiwaste |