Short-term forecast of lateral inflow in Boguchanskaya hydropower station reservoir
Relevance of the work. Boguchanskaya hydropower station on the Angara river was put into operation in 2014. It is one of the largest hydraulic engineering constructions in Eastern Siberia. Boguchanskaya hydropower station is designed to meet the growing energy deficit. At project operating mode of t...
Main Authors: | Dmitry Anatolievich Burakov, Lev Aleksandrovich Putintsev |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Tomsk Polytechnic University
2017-09-01
|
Series: | Известия Томского политехнического университета: Инжиниринг георесурсов |
Subjects: | |
Online Access: | http://izvestiya-tpu.ru/archive/article/view/1752 |
Similar Items
-
Short-term forecast of lateral inflow in Boguchanskaya hydropower station reservoir
by: Dmitry Anatolievich Burakov, et al.
Published: (2017-09-01) -
Evaluation of global forcing datasets for hydropower inflow simulation in Nepal
by: Bikas Chandra Bhattarai, et al.
Published: (2020-04-01) -
Evaluation of Ensemble Inflow Forecasts for Reservoir Management in Flood Situations
by: Juliana Mendes, et al.
Published: (2023-01-01) -
Inflow Scenario Generation for the Ethiopian Hydropower System
by: Firehiwot Girma Dires, et al.
Published: (2023-01-01) -
Identification of Hydrological Models for Enhanced Ensemble Reservoir Inflow Forecasting in a Large Complex Prairie Watershed
by: Frezer Seid Awol, et al.
Published: (2019-10-01)