ANALYZING DYNAMICS OF IRAN'S PUBLIC CONSTRUCTION PROJECTS DELIVERED UNDER DESIGN-BID-BUILD METHOD
Currently, many public construction projects in Iran are facing time delays, cost overruns, and poor quality. Many research efforts have been conducted to identify the root-cause...
Main Author: | |
---|---|
Format: | Article |
Language: | fas |
Published: |
Sharif University of Technology
2020-05-01
|
Series: | مهندسی عمران شریف |
Subjects: | |
Online Access: | https://sjce.journals.sharif.edu/article_21159_8f89ef5af72a5cffdeb2759d409f9766.pdf |
_version_ | 1797738821766348800 |
---|---|
author | A. Alvanchi |
author_facet | A. Alvanchi |
author_sort | A. Alvanchi |
collection | DOAJ |
description | Currently, many public construction projects in Iran are facing time delays, cost overruns, and poor quality. Many research efforts have been conducted to identify the root-causes of the problems these projects are facing. Most of these research efforts, though, have adopted survey and interview-based methods to investigate the contributing factors. Financial resource shortage, project management weakness, and contractual disputes are among the commonly identified contributing factors. In a systemic view of the root causes of problems in public construction projects, projects organization and related regulations can be responsible for the main parts of the root causes. Meanwhile, uniform or standard-form contracts set by Iran's government have major contributions to the structure of the public construction projects organization. Uniform contracts, developed by dedicated groups of experts, save project owners' time and prevent many possible critical issues from the complexity involved in public construction projects. However, in-advance development of the uniform contracts poses the risk that any possible shortfall in the uniform contracts can get populated among all public projects implemented across the country. To address this issue in this research a conceptual system dynamics-based analysis approach was adopted. This approach was used to analyze the complex dynamic interactions of different stakeholders formed as results of the pre-determined instructions of uniform contracts in the public construction projects. The main focus of this research is on the dynamics of the public construction projects implemented under the design-bid-build project delivery method. Two uniform contracts commonly used for the implementation of the design-bid-build projects in the country, including consulting services and construction services, were investigated. Main causal loops formed as results of current settings of these uniform contracts were extracted and analyzed. As a result of this analysis, assigned roles in these uniform contracts to the public project owners and project designers were challenged and adjustments to the assigned roles were recommended. |
first_indexed | 2024-03-12T13:48:23Z |
format | Article |
id | doaj.art-bc2835cc9f184880833e38f195a10859 |
institution | Directory Open Access Journal |
issn | 2676-4768 2676-4776 |
language | fas |
last_indexed | 2024-03-12T13:48:23Z |
publishDate | 2020-05-01 |
publisher | Sharif University of Technology |
record_format | Article |
series | مهندسی عمران شریف |
spelling | doaj.art-bc2835cc9f184880833e38f195a108592023-08-23T07:53:29ZfasSharif University of Technologyمهندسی عمران شریف2676-47682676-47762020-05-0136.21.131010.24200/j30.2018.2129.210021159ANALYZING DYNAMICS OF IRAN'S PUBLIC CONSTRUCTION PROJECTS DELIVERED UNDER DESIGN-BID-BUILD METHODA. Alvanchi0Dept. of Civil Engineering Sharif University of TechnologyCurrently, many public construction projects in Iran are facing time delays, cost overruns, and poor quality. Many research efforts have been conducted to identify the root-causes of the problems these projects are facing. Most of these research efforts, though, have adopted survey and interview-based methods to investigate the contributing factors. Financial resource shortage, project management weakness, and contractual disputes are among the commonly identified contributing factors. In a systemic view of the root causes of problems in public construction projects, projects organization and related regulations can be responsible for the main parts of the root causes. Meanwhile, uniform or standard-form contracts set by Iran's government have major contributions to the structure of the public construction projects organization. Uniform contracts, developed by dedicated groups of experts, save project owners' time and prevent many possible critical issues from the complexity involved in public construction projects. However, in-advance development of the uniform contracts poses the risk that any possible shortfall in the uniform contracts can get populated among all public projects implemented across the country. To address this issue in this research a conceptual system dynamics-based analysis approach was adopted. This approach was used to analyze the complex dynamic interactions of different stakeholders formed as results of the pre-determined instructions of uniform contracts in the public construction projects. The main focus of this research is on the dynamics of the public construction projects implemented under the design-bid-build project delivery method. Two uniform contracts commonly used for the implementation of the design-bid-build projects in the country, including consulting services and construction services, were investigated. Main causal loops formed as results of current settings of these uniform contracts were extracted and analyzed. As a result of this analysis, assigned roles in these uniform contracts to the public project owners and project designers were challenged and adjustments to the assigned roles were recommended.https://sjce.journals.sharif.edu/article_21159_8f89ef5af72a5cffdeb2759d409f9766.pdftechnical and executive systempublic projectsdynamic system analysisdesign-bid-build methodstandard-form contract |
spellingShingle | A. Alvanchi ANALYZING DYNAMICS OF IRAN'S PUBLIC CONSTRUCTION PROJECTS DELIVERED UNDER DESIGN-BID-BUILD METHOD مهندسی عمران شریف technical and executive system public projects dynamic system analysis design-bid-build method standard-form contract |
title | ANALYZING DYNAMICS OF IRAN'S PUBLIC CONSTRUCTION PROJECTS DELIVERED UNDER DESIGN-BID-BUILD METHOD |
title_full | ANALYZING DYNAMICS OF IRAN'S PUBLIC CONSTRUCTION PROJECTS DELIVERED UNDER DESIGN-BID-BUILD METHOD |
title_fullStr | ANALYZING DYNAMICS OF IRAN'S PUBLIC CONSTRUCTION PROJECTS DELIVERED UNDER DESIGN-BID-BUILD METHOD |
title_full_unstemmed | ANALYZING DYNAMICS OF IRAN'S PUBLIC CONSTRUCTION PROJECTS DELIVERED UNDER DESIGN-BID-BUILD METHOD |
title_short | ANALYZING DYNAMICS OF IRAN'S PUBLIC CONSTRUCTION PROJECTS DELIVERED UNDER DESIGN-BID-BUILD METHOD |
title_sort | analyzing dynamics of iran s public construction projects delivered under design bid build method |
topic | technical and executive system public projects dynamic system analysis design-bid-build method standard-form contract |
url | https://sjce.journals.sharif.edu/article_21159_8f89ef5af72a5cffdeb2759d409f9766.pdf |
work_keys_str_mv | AT aalvanchi analyzingdynamicsofiranspublicconstructionprojectsdeliveredunderdesignbidbuildmethod |