Assessing dam spillway discharge capacity in response to extreme floods in Perak river hydroelectric scheme: Simulation and proposed mitigation measures
The aged dams in Perak river Hydro-Electric Scheme (HES) have been constructed decades ago and a common concern raised during dam safety reviews is that they were not designed to safely reroute the Probable Maximum Flood (PMF) but rather the Inflow Design Flood (IDF) of 1,000 years’ design floods. F...
Main Authors: | Syahida Farhan Azha, Lariyah Mohd Sidek, Kahhoong Kok, Sarbani Anjang Ahmad, Darul Hisham Saman, Siti Mariam Allias Omar, Hidayah Basri, Mohd Hafiz Zawawi, Ali Najah Ahmed |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2023-11-01
|
Series: | Ain Shams Engineering Journal |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S209044792300429X |
Similar Items
-
THE ESTIMATION OF PMP AND PMF ON ALPINE BASINS IN SWITZERLAND
by: R. Receanu, et al.
Published: (2012-03-01) -
Probable maximum flood in a changing climate: An overview for Canadian basins
by: Jacinthe Clavet-Gaumont, et al.
Published: (2017-10-01) -
Non-Stationary Hydrological Regimes Due to Climate Change: The Impact of Future Precipitation in the Spillway Design of a Reservoir, Case Study: Sube y Baja Dam, in Ecuador
by: Jorge Enrique Herbozo, et al.
Published: (2022-05-01) -
Comparison of physical and statistical methods for estimating probable maximum precipitation in southwestern basins of Iran
by: E. Fattahi, et al.
Published: (2010-12-01) -
Estimation of probable maximum precipitation 24-h (PMP 24-h) through statistical methods over Iran
by: Ebrahim Fattahi, et al.
Published: (2022-08-01)