Optimization of supercharged gathering scheme for YQ2 Wellblock by multi-level fuzzy evaluation
With the continuous development of YQ2 Wellblock, it is estimated that there will be about 65.42% of gas wells whose wellhead pressure cannot reach the required inlet pressure within two years, and then, the wellblock cannot be maintained at stable production. Thus, it is urgent to conduct the resea...
Main Authors: | LIANG Yuru, HE Peng, HAN Jianhong, HU Yaoqiang, ZHANG Chengbin, YI Dongrui |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Oil & Gas Storage and Transportation
2022-12-01
|
Series: | You-qi chuyun |
Subjects: | |
Online Access: | http://kykxxb.cumtb.edu.cn/article/10.6047/j.issn.1000-8241.2022.12.009 |
Similar Items
-
Design and development of air compartment for supercharger /
by: Azhar Abdul Aziz, et al.
Published: (2003) -
Supercharger versus turbocharger in vehicle applications/
by: 512618 Uthoff, Loren H, et al. -
Design and analysis for the development of a small supercharger test rig /
by: Ng, Keng Yong, 1986-, et al.
Published: (2010) -
Design and analysis for the development of a small supercharger test rig [electronic resource] /
by: Ng, Keng Yong, 1986-
Published: (2010) -
Design a supercharger for a single-cylinder nutating type two-stroke engine /
by: 357374 Cheah, Keng Keat
Published: (2006)