Aplikasi Metode Time Cost Trade Off Pada Proyek Konstruksi: Studi Kasus Proyek Pembangunan Gedung Indonesia
<p>Time and cost are very infuential to the success and failure of a project. The measurement of project can be seen by the short time arrangment and minimum cost without denying the quality of project result. Systematically project management is very needed to make sure the time of project re...
Main Authors: | Mandiyo Priyo, Muhamad Raa’uf Aulia |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Muhammadiyah Yogyakarta
2016-01-01
|
Series: | Semesta Teknika |
Subjects: | |
Online Access: | https://journal.umy.ac.id/index.php/st/article/view/703 |
Similar Items
-
Aplikasi Value Engineering pada Proyek Konstruksi (Studi Kasus: Proyek Pembangunan Gedung BPKP Yogyakarta)
by: Mandiyo Priyo, et al.
Published: (2016-03-01) -
Studi Optimasi Waktu dan Biaya dengan Metode Time Cost Trade Off pada Proyek Konstruksi : Studi Kasus Proyek Jalan Bugel-Galur-Poncosari Cs. Tahap I, Provinsi D.I. Yogyakarta
by: Mandiyo Priyo, et al.
Published: (2017-11-01) -
Penerapan Metode “Earn Value” Dan “Project Crashing” Pada Proyek Konstruksi: Studi Kasus Pembangunan Gedung IGD RSUD Sunan Kalijaga, Demak
by: Mandiyo Priyo, et al.
Published: (2017-11-01) -
Konsep Earned Value dalam Aplikasi Pengelolaan Proyek Konstruksi
by: Mandiyo Priyo, et al.
Published: (2016-05-01) -
Analisis Percepatan Waktu Dan Biaya Proyek Konstruksi Dengan Penambahan Jam Kerja (Lembur) Menggunakan Metode Time Cost Trade Off : Studi Kasus Proyek Pembangunan Prasarana Pengendali Banjir
by: Mandiyo Priyo, et al.
Published: (2016-12-01)