Cost optimization of multiunit construction projects using linear programming and metaheuristic-based simulated annealing algorithm
The article presents the cost optimization model for multiunit construction projects. Multiunit projects constitute a special case of repetitive projects. They consist in the realization of many different, when it comes to size, types of residential, commercial, industrial buildings or engineering s...
Main Authors: | Michał Podolski, Bartłomiej Sroka |
---|---|
Format: | Article |
Language: | English |
Published: |
Vilnius Gediminas Technical University
2019-11-01
|
Series: | Journal of Civil Engineering and Management |
Subjects: | |
Online Access: | https://journals.vgtu.lt/index.php/JCEM/article/view/11308 |
Similar Items
-
Scheduling of Job Resources in Multiunit Projects with the Use of Time I Cost Criteria
by: Podolski M.
Published: (2016-03-01) -
The Impact of the Learning and Forgetting Effect on the Cost of a Multi-Unit Construction Project with the Use of the Simulated Annealing Algorithm
by: Michał Podolski, et al.
Published: (2022-12-01) -
Solving a mixed-integer linear programming model for a multi-skilled project scheduling problem by simulated annealing
by: H Kazemipoor, et al.
Published: (2012-04-01) -
Scheduling repetitive construction projects: structured literature review
by: Michał Tomczak, et al.
Published: (2022-05-01) -
Modeling of the harmonization method for executing a multi-unit construction project
by: Tomczak Michał
Published: (2019-07-01)