Development of Mechanical Pipe-Connection Design for DEMO

Maintenance of the DEMO breeding blanket includes the removal and replacement of plasma-facing components. To access the breeding blanket, multiple coolant pipes need to be removed to allow access to the tokamak. As an option to reduce downtime and increase maintenance speed, the pipe-connection con...

Full description

Bibliographic Details
Main Authors: Viktor Milushev, Azman Azka, Martin Mittwollen
Format: Article
Language:English
Published: MDPI AG 2023-01-01
Series:Journal of Nuclear Engineering
Subjects:
Online Access:https://www.mdpi.com/2673-4362/4/1/8
_version_ 1827749271428923392
author Viktor Milushev
Azman Azka
Martin Mittwollen
author_facet Viktor Milushev
Azman Azka
Martin Mittwollen
author_sort Viktor Milushev
collection DOAJ
description Maintenance of the DEMO breeding blanket includes the removal and replacement of plasma-facing components. To access the breeding blanket, multiple coolant pipes need to be removed to allow access to the tokamak. As an option to reduce downtime and increase maintenance speed, the pipe-connection concept is developed to allow the removal of multiple pipes at the same time using a remotely operated mechanical connection. The remotely operated multi-pipe Mechanical Pipe Connection (MPC) needs to fulfil multiple requirements, such as high operating temperature and high external forces while at the same time maintaining an acceptable level of sealing between the high-pressure fluid and vacuum surroundings. In addition to the external conditions, the pipes of multiple sizes and fluids are connected in a manifold configuration. Although this will reduce the overall time required to operate the mechanical pipe connection when compared to multiple single-pipe connections, this will introduce additional forces and stresses due the interaction between pipe flow (e.g., simultaneous high- and low-temperature fluid pipes on the same manifold) through the manifold flange. The requirements and the boundary conditions of the multi-pipe MPC are taken into consideration during the design process of MPC. The design process is carried out to find the optimum form and size to allow the mechanical function of the pipe connection during the maintenance phase while withstanding the extreme operating conditions that the MPC will face the during operational phase. The resulting design will then be analyzed using numerical methods to assess the capability of the MPC designs.
first_indexed 2024-03-11T06:20:27Z
format Article
id doaj.art-c0b1fb517f584dd399d597f589d003df
institution Directory Open Access Journal
issn 2673-4362
language English
last_indexed 2024-03-11T06:20:27Z
publishDate 2023-01-01
publisher MDPI AG
record_format Article
series Journal of Nuclear Engineering
spelling doaj.art-c0b1fb517f584dd399d597f589d003df2023-11-17T11:59:05ZengMDPI AGJournal of Nuclear Engineering2673-43622023-01-014111112610.3390/jne4010008Development of Mechanical Pipe-Connection Design for DEMOViktor Milushev0Azman Azka1Martin Mittwollen2Karlsruhe Institute of Technology, 76131 Karlsruhe, GermanyKarlsruhe Institute of Technology, 76131 Karlsruhe, GermanyKarlsruhe Institute of Technology, 76131 Karlsruhe, GermanyMaintenance of the DEMO breeding blanket includes the removal and replacement of plasma-facing components. To access the breeding blanket, multiple coolant pipes need to be removed to allow access to the tokamak. As an option to reduce downtime and increase maintenance speed, the pipe-connection concept is developed to allow the removal of multiple pipes at the same time using a remotely operated mechanical connection. The remotely operated multi-pipe Mechanical Pipe Connection (MPC) needs to fulfil multiple requirements, such as high operating temperature and high external forces while at the same time maintaining an acceptable level of sealing between the high-pressure fluid and vacuum surroundings. In addition to the external conditions, the pipes of multiple sizes and fluids are connected in a manifold configuration. Although this will reduce the overall time required to operate the mechanical pipe connection when compared to multiple single-pipe connections, this will introduce additional forces and stresses due the interaction between pipe flow (e.g., simultaneous high- and low-temperature fluid pipes on the same manifold) through the manifold flange. The requirements and the boundary conditions of the multi-pipe MPC are taken into consideration during the design process of MPC. The design process is carried out to find the optimum form and size to allow the mechanical function of the pipe connection during the maintenance phase while withstanding the extreme operating conditions that the MPC will face the during operational phase. The resulting design will then be analyzed using numerical methods to assess the capability of the MPC designs.https://www.mdpi.com/2673-4362/4/1/8DEMOmechanical pipe connectionmaintenancenumerical analysis
spellingShingle Viktor Milushev
Azman Azka
Martin Mittwollen
Development of Mechanical Pipe-Connection Design for DEMO
Journal of Nuclear Engineering
DEMO
mechanical pipe connection
maintenance
numerical analysis
title Development of Mechanical Pipe-Connection Design for DEMO
title_full Development of Mechanical Pipe-Connection Design for DEMO
title_fullStr Development of Mechanical Pipe-Connection Design for DEMO
title_full_unstemmed Development of Mechanical Pipe-Connection Design for DEMO
title_short Development of Mechanical Pipe-Connection Design for DEMO
title_sort development of mechanical pipe connection design for demo
topic DEMO
mechanical pipe connection
maintenance
numerical analysis
url https://www.mdpi.com/2673-4362/4/1/8
work_keys_str_mv AT viktormilushev developmentofmechanicalpipeconnectiondesignfordemo
AT azmanazka developmentofmechanicalpipeconnectiondesignfordemo
AT martinmittwollen developmentofmechanicalpipeconnectiondesignfordemo