Remodeling of Kalri Baghar (K.B) Feeder
The shortage of irrigation water supplies and reduced water carrying capacity of Kalri Baghar (K.B) feeder require remodeling of the canal (an off-taking canal from right bank of Indus River at Kotri Barrage). The designed normal supply level (NSL) capacity of K.B feeder was 257 cumecs (9100 cusecs...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Mehran University of Engineering and Technology
2010-10-01
|
Series: | Mehran University Research Journal of Engineering and Technology |
Subjects: | |
Online Access: | http://publications.muet.edu.pk/research_papers/pdf/pdf52.pdf |