Total completion time minimization for scheduling of two-machine flow shop with deterioration jobs and setup time
This article studies a scheduling problem of a two-machine flow shop with both time-dependent deteriorating jobs and sequence-independent setup time. It is assumed that the deterioration of processing time and setup time is of a linear increasing function with respect to the starting time. The objec...
Main Authors: | Ning He, Yan Qiao, NaiQi Wu, Ting Qu |
---|---|
Format: | Article |
Language: | English |
Published: |
SAGE Publishing
2017-04-01
|
Series: | Advances in Mechanical Engineering |
Online Access: | https://doi.org/10.1177/1687814017698887 |
Similar Items
-
Single Machine Scheduling Proportionally Deteriorating Jobs with Ready Times Subject to the Total Weighted Completion Time Minimization
by: Zheng-Guo Lv, et al.
Published: (2024-02-01) -
A hybrid algorithm for flexible job-shop scheduling problem with setup times
by: Ameni Azzouz, et al.
Published: (2017-01-01) -
Flexible Job Shop Scheduling Method for Optimizing Mold Resource Setup Time
by: Yi Cheng, et al.
Published: (2024-01-01) -
Scheduling with Resource Allocation, Deteriorating Effect and Group Technology to Minimize Total Completion Time
by: Jia-Xuan Yan, et al.
Published: (2022-08-01) -
Two-machine flowshop scheduling problem to minimize makespan or
total completion time with random and bounded setup times
by: Ali Allahverdi, et al.
Published: (2003-01-01)