Mathematical Programming for Lot Sizing and Production Scheduling in Foundries
The problem considered in the paper is motivated by production planning in a foundry equipped with the furnace and casting line, which provides a variety of castings in various grades of cast iron/steel for a large number of customers. The quantity of molten metal does not exceed the capacity of the...
Main Authors: | Duda J., Stawowy A., Basiura R. |
---|---|
Format: | Article |
Language: | English |
Published: |
Polish Academy of Sciences
2014-08-01
|
Series: | Archives of Foundry Engineering |
Subjects: | |
Online Access: | http://www.degruyter.com/view/j/afe.2014.14.issue-3/afe-2014-0053/afe-2014-0053.xml?format=INT |
Similar Items
-
Coordinated Production Planning and Scheduling Problem in a Foundry
by: Stawowy A., et al.
Published: (2017-09-01) -
Iterated Local Search for Foundry Lotsizing and Scheduling Problem with Setup Costs
by: Stawowy A., et al.
Published: (2017-12-01) -
Application of Interval Arithmetic to Production Planning in a Foundry
by: Duda J., et al.
Published: (2017-03-01) -
Production Scheduling under Fuzziness for the Furnace - Casting Line System
by: Duda J., et al.
Published: (2015-12-01) -
Applicability of Business Rules to Production Management in Foundries
by: Stawowy A., et al.
Published: (2016-03-01)