MitC: Open-source software for construction project control and delay mitigation
Changes in a construction project schedule can impact the project’s planned duration, resulting in penalties. A manual trial-and-error probabilistic approach is usually conducted to find an appropriate set of corrective measures to mitigate delays of the overall project. However, this approach does...
Main Authors: | Omar Kammouh, M.W.A. (Maurits) Kok, Maria Nogal, Ruud Binnekamp, A.R.M. (Rogier) Wolfert |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2022-06-01
|
Series: | SoftwareX |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2352711022000267 |
Similar Items
-
Schedule Delay Risk Analysis in Construction Projects with a Simulation-Based Expert System
by: Georgios K. Koulinas, et al.
Published: (2020-07-01) -
Approaches to evaluating measurement uncertainty
by: Forbes A.B.
Published: (2012-01-01) -
Leading-order determination of the gluon polarisation from semi-inclusive deep inelastic scattering data
by: C. Adolph, et al.
Published: (2017-04-01) -
On Meeting a Maximum Delay Constraint Using Reinforcement Learning
by: Hossein Shafieirad, et al.
Published: (2022-01-01) -
An Estimation Method for Schedulable Capability of Aggregated Electric Vehicles Considering Response Uncertainty
by: WANG Jixing, et al.
Published: (2022-05-01)