Conventional and Advanced Exergy and Exergoeconomic Analysis of a Spray Drying System: A Case Study of an Instant Coffee Factory in Ecuador

Instant coffee is produced worldwide by spray drying coffee extract on an industrial scale. This production process is energy intensive, 70% of the operational costs are due to energy requirements. This study aims to identify the potential for energy and cost improvements by performing a conventiona...

Full description

Bibliographic Details
Main Authors: Diana L. Tinoco-Caicedo, Alexis Lozano-Medina, Ana M. Blanco-Marigorta
Format: Article
Language:English
Published: MDPI AG 2020-10-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/13/21/5622
_version_ 1797549699844014080
author Diana L. Tinoco-Caicedo
Alexis Lozano-Medina
Ana M. Blanco-Marigorta
author_facet Diana L. Tinoco-Caicedo
Alexis Lozano-Medina
Ana M. Blanco-Marigorta
author_sort Diana L. Tinoco-Caicedo
collection DOAJ
description Instant coffee is produced worldwide by spray drying coffee extract on an industrial scale. This production process is energy intensive, 70% of the operational costs are due to energy requirements. This study aims to identify the potential for energy and cost improvements by performing a conventional and advanced exergy and exergoeconomic analysis to an industrial-scale spray drying process for the production of instant coffee, using actual operational data. The study analyzed the steam generation unit, the air and coffee extract preheater, the drying section, and the final post treatment process. The performance parameters such as exergetic efficiency, exergoeconomic factor, and avoidable investment cost rate for each individual component were determined. The overall energy and exergy efficiencies of the spray drying system are 67.6% and 30.6%, respectively. The highest rate of exergy destruction is located in the boiler, which amounts to 543 kW. However, the advanced exergoeconomic analysis shows that the highest exergy destruction cost rates are located in the spray dryer and the air heat exchanger (106.9 $/h and 60.5 $/h, respectively), of which 47.7% and 3.8%, respectively, are avoidable. Accordingly, any process improvement should focus on the exergoeconomic optimization of the spray dryer.
first_indexed 2024-03-10T15:18:10Z
format Article
id doaj.art-c23b7d97a6b5415f8847f8221acddf30
institution Directory Open Access Journal
issn 1996-1073
language English
last_indexed 2024-03-10T15:18:10Z
publishDate 2020-10-01
publisher MDPI AG
record_format Article
series Energies
spelling doaj.art-c23b7d97a6b5415f8847f8221acddf302023-11-20T18:45:36ZengMDPI AGEnergies1996-10732020-10-011321562210.3390/en13215622Conventional and Advanced Exergy and Exergoeconomic Analysis of a Spray Drying System: A Case Study of an Instant Coffee Factory in EcuadorDiana L. Tinoco-Caicedo0Alexis Lozano-Medina1Ana M. Blanco-Marigorta2Facultad de Ciencias Naturales y Matemáticas, Escuela Superior Politécnica del Litoral, 090903 Guayaquil, EcuadorDepartment of Process Engineering, Universidad de las Palmas de Gran Canaria, 35017 Las Palmas de Gran Canaria, SpainDepartment of Process Engineering, Universidad de las Palmas de Gran Canaria, 35017 Las Palmas de Gran Canaria, SpainInstant coffee is produced worldwide by spray drying coffee extract on an industrial scale. This production process is energy intensive, 70% of the operational costs are due to energy requirements. This study aims to identify the potential for energy and cost improvements by performing a conventional and advanced exergy and exergoeconomic analysis to an industrial-scale spray drying process for the production of instant coffee, using actual operational data. The study analyzed the steam generation unit, the air and coffee extract preheater, the drying section, and the final post treatment process. The performance parameters such as exergetic efficiency, exergoeconomic factor, and avoidable investment cost rate for each individual component were determined. The overall energy and exergy efficiencies of the spray drying system are 67.6% and 30.6%, respectively. The highest rate of exergy destruction is located in the boiler, which amounts to 543 kW. However, the advanced exergoeconomic analysis shows that the highest exergy destruction cost rates are located in the spray dryer and the air heat exchanger (106.9 $/h and 60.5 $/h, respectively), of which 47.7% and 3.8%, respectively, are avoidable. Accordingly, any process improvement should focus on the exergoeconomic optimization of the spray dryer.https://www.mdpi.com/1996-1073/13/21/5622advanced exergoeconomic analysisspray dryerexergy destruction cost rate
spellingShingle Diana L. Tinoco-Caicedo
Alexis Lozano-Medina
Ana M. Blanco-Marigorta
Conventional and Advanced Exergy and Exergoeconomic Analysis of a Spray Drying System: A Case Study of an Instant Coffee Factory in Ecuador
Energies
advanced exergoeconomic analysis
spray dryer
exergy destruction cost rate
title Conventional and Advanced Exergy and Exergoeconomic Analysis of a Spray Drying System: A Case Study of an Instant Coffee Factory in Ecuador
title_full Conventional and Advanced Exergy and Exergoeconomic Analysis of a Spray Drying System: A Case Study of an Instant Coffee Factory in Ecuador
title_fullStr Conventional and Advanced Exergy and Exergoeconomic Analysis of a Spray Drying System: A Case Study of an Instant Coffee Factory in Ecuador
title_full_unstemmed Conventional and Advanced Exergy and Exergoeconomic Analysis of a Spray Drying System: A Case Study of an Instant Coffee Factory in Ecuador
title_short Conventional and Advanced Exergy and Exergoeconomic Analysis of a Spray Drying System: A Case Study of an Instant Coffee Factory in Ecuador
title_sort conventional and advanced exergy and exergoeconomic analysis of a spray drying system a case study of an instant coffee factory in ecuador
topic advanced exergoeconomic analysis
spray dryer
exergy destruction cost rate
url https://www.mdpi.com/1996-1073/13/21/5622
work_keys_str_mv AT dianaltinococaicedo conventionalandadvancedexergyandexergoeconomicanalysisofaspraydryingsystemacasestudyofaninstantcoffeefactoryinecuador
AT alexislozanomedina conventionalandadvancedexergyandexergoeconomicanalysisofaspraydryingsystemacasestudyofaninstantcoffeefactoryinecuador
AT anamblancomarigorta conventionalandadvancedexergyandexergoeconomicanalysisofaspraydryingsystemacasestudyofaninstantcoffeefactoryinecuador