OPTIMIZATION OF THE FEASIBILITY OF MICRO HYDRO POWER PLANT (PLTMH) RAMPUSA SUB DISTRICT OF LEMBANG REGENCY PINRANG

Economic growth and basic electrical energy pentarifan (TDL) that is determined by the Government and PLN is the thing that most affect the usage/consumption of electrical energy, as in the theory of microeconomics, the demand for a commodity including energy electricity is influenced by various fac...

Full description

Bibliographic Details
Main Authors: Mochammad Apriyadi Hadi Sirad, Rosihan Aminuddin
Format: Article
Language:Indonesian
Published: Department of Electrical Engineering, Universitas Patria Artha 2017-10-01
Series:Patria Artha Technological Journal
Subjects:
Online Access:http://ejournal.patria-artha.ac.id/index.php/patj/article/view/71
_version_ 1797255533180223488
author Mochammad Apriyadi Hadi Sirad
Rosihan Aminuddin
author_facet Mochammad Apriyadi Hadi Sirad
Rosihan Aminuddin
author_sort Mochammad Apriyadi Hadi Sirad
collection DOAJ
description Economic growth and basic electrical energy pentarifan (TDL) that is determined by the Government and PLN is the thing that most affect the usage/consumption of electrical energy, as in the theory of microeconomics, the demand for a commodity including energy electricity is influenced by various factors, including the following: the requested prices of goods, the prices of other goods, income, tastes and prosperity. The provision of electricity is not only meant as a tool for tackling poverty, but also dimaksdukan for equitable development and advance the villages as a force for the national economy. Therefore to meet the need for electric lighting for remote areas need to be created a tool that can reach remote places that are cheap and environmentally friendly, that micro hydro power plant. This research aims to know the feasibility of Micro Hydro power plant Rampusa sub district of Lembang Regency pinrang. This research is the research of ex-post-facto that is descriptive. The sample in this research is to look at the technical aspects of PLTMH. As for side input consists of water discharge (Q) effective falls high (H), the State of the generator, turbine, form the type of pipeline and the turbine House (power house). As for the Power output is generated (P), Village PLTMH rampusadan load Protection installed. The result of the research of the optimization of the feasibility of Micro Hydro power plant Rampusa sub district of Lembang Regency Pinrang, with discharge water 0.17 m3/sec, 23 m high waterfall with a power generator with a capacity of kW 26.04 20 kVA, kVA 32.55 should use by using different types of crossflow turbine the turbine type France should use, type of PVC pipe 12 "which is above the soil surface that is supposed to be planted in the ground, a burdens attached 23980 VA and cable distribution is used. So a descriptive analysis of the results showed that PLTMH rampusa Village sub district of Lembang Regency Pinrang not feasible from a technical point.
first_indexed 2024-04-24T22:07:21Z
format Article
id doaj.art-c3150d210e78456680ec4e73cb9b7e05
institution Directory Open Access Journal
issn 2549-6131
2549-614X
language Indonesian
last_indexed 2024-04-24T22:07:21Z
publishDate 2017-10-01
publisher Department of Electrical Engineering, Universitas Patria Artha
record_format Article
series Patria Artha Technological Journal
spelling doaj.art-c3150d210e78456680ec4e73cb9b7e052024-03-20T11:40:04ZindDepartment of Electrical Engineering, Universitas Patria ArthaPatria Artha Technological Journal2549-61312549-614X2017-10-011210712210.33857/patj.v1i2.7140OPTIMIZATION OF THE FEASIBILITY OF MICRO HYDRO POWER PLANT (PLTMH) RAMPUSA SUB DISTRICT OF LEMBANG REGENCY PINRANGMochammad Apriyadi Hadi SiradRosihan AminuddinEconomic growth and basic electrical energy pentarifan (TDL) that is determined by the Government and PLN is the thing that most affect the usage/consumption of electrical energy, as in the theory of microeconomics, the demand for a commodity including energy electricity is influenced by various factors, including the following: the requested prices of goods, the prices of other goods, income, tastes and prosperity. The provision of electricity is not only meant as a tool for tackling poverty, but also dimaksdukan for equitable development and advance the villages as a force for the national economy. Therefore to meet the need for electric lighting for remote areas need to be created a tool that can reach remote places that are cheap and environmentally friendly, that micro hydro power plant. This research aims to know the feasibility of Micro Hydro power plant Rampusa sub district of Lembang Regency pinrang. This research is the research of ex-post-facto that is descriptive. The sample in this research is to look at the technical aspects of PLTMH. As for side input consists of water discharge (Q) effective falls high (H), the State of the generator, turbine, form the type of pipeline and the turbine House (power house). As for the Power output is generated (P), Village PLTMH rampusadan load Protection installed. The result of the research of the optimization of the feasibility of Micro Hydro power plant Rampusa sub district of Lembang Regency Pinrang, with discharge water 0.17 m3/sec, 23 m high waterfall with a power generator with a capacity of kW 26.04 20 kVA, kVA 32.55 should use by using different types of crossflow turbine the turbine type France should use, type of PVC pipe 12 "which is above the soil surface that is supposed to be planted in the ground, a burdens attached 23980 VA and cable distribution is used. So a descriptive analysis of the results showed that PLTMH rampusa Village sub district of Lembang Regency Pinrang not feasible from a technical point.http://ejournal.patria-artha.ac.id/index.php/patj/article/view/71optimization, feasibility, pltmh, generator, rampusa sub district of lembang regency pinrang
spellingShingle Mochammad Apriyadi Hadi Sirad
Rosihan Aminuddin
OPTIMIZATION OF THE FEASIBILITY OF MICRO HYDRO POWER PLANT (PLTMH) RAMPUSA SUB DISTRICT OF LEMBANG REGENCY PINRANG
Patria Artha Technological Journal
optimization, feasibility, pltmh, generator, rampusa sub district of lembang regency pinrang
title OPTIMIZATION OF THE FEASIBILITY OF MICRO HYDRO POWER PLANT (PLTMH) RAMPUSA SUB DISTRICT OF LEMBANG REGENCY PINRANG
title_full OPTIMIZATION OF THE FEASIBILITY OF MICRO HYDRO POWER PLANT (PLTMH) RAMPUSA SUB DISTRICT OF LEMBANG REGENCY PINRANG
title_fullStr OPTIMIZATION OF THE FEASIBILITY OF MICRO HYDRO POWER PLANT (PLTMH) RAMPUSA SUB DISTRICT OF LEMBANG REGENCY PINRANG
title_full_unstemmed OPTIMIZATION OF THE FEASIBILITY OF MICRO HYDRO POWER PLANT (PLTMH) RAMPUSA SUB DISTRICT OF LEMBANG REGENCY PINRANG
title_short OPTIMIZATION OF THE FEASIBILITY OF MICRO HYDRO POWER PLANT (PLTMH) RAMPUSA SUB DISTRICT OF LEMBANG REGENCY PINRANG
title_sort optimization of the feasibility of micro hydro power plant pltmh rampusa sub district of lembang regency pinrang
topic optimization, feasibility, pltmh, generator, rampusa sub district of lembang regency pinrang
url http://ejournal.patria-artha.ac.id/index.php/patj/article/view/71
work_keys_str_mv AT mochammadapriyadihadisirad optimizationofthefeasibilityofmicrohydropowerplantpltmhrampusasubdistrictoflembangregencypinrang
AT rosihanaminuddin optimizationofthefeasibilityofmicrohydropowerplantpltmhrampusasubdistrictoflembangregencypinrang