Application of Production Scheduling Techniques for Dispatching Ready-mixed Concrete
Nowadays, the ready-mixed concrete (RMC) industry plays an important role in construction projects, since it has become one of the mechanisms in construction works and it has become more widely used than in the past. Increasing efficiency is focused on in order to be competitive in business. The...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Indonesia
2016-12-01
|
Series: | International Journal of Technology |
Subjects: | |
Online Access: | http://ijtech.eng.ui.ac.id/article/view/300 |
_version_ | 1828076917510635520 |
---|---|
author | Kittipong Thawongklang Ladda Tanwanichkul |
author_facet | Kittipong Thawongklang Ladda Tanwanichkul |
author_sort | Kittipong Thawongklang |
collection | DOAJ |
description | Nowadays, the ready-mixed concrete (RMC)
industry plays an important role in construction projects, since it has become
one of the mechanisms in construction works and it has become more widely used
than in the past. Increasing efficiency is focused on in order to be
competitive in business. Therefore, this study aims to increase efficiency of
the delivery management system by using the modeling of production planning and
management of daily scheduling and dispatching of ready-mixed concrete trucks
in order to solve the bottleneck problems of production, which are consequently
affecting the RMC delivery process .In fact, the capacity of ready-mixed
concrete machines seems to be a limitation, since concrete can only be mixed
and then delivered in batches, one vehicle at a time. Earliest Due Date (EDD)
and First-Come, First-Served (FCFS) are two techniques of priority rules used
for RMC scheduling in providing more precision and accuracy of related inputs
which can be used in order improve efficiency of the entire RMC process. In the
model, factors affecting the RMC delivery process, such as distances, travel
speed and travel times are determined by using GIS–Geographic Information
Systems software (ArcGIS). The mapping data is also input into the construction
site data, which then builds a model based on priority rules to determine the
production and dispatching schedule. Preliminary results from the model
indicated that delivery delays can be reduced, in addition to improving daily
scheduling and reducing planning time. Moreover, the Single Machine-Multiple
Sites model was applied to a concrete truck freight management company that had
only one manufacturing machine and it had to deliver to several construction
sites in various urban areas. By improving efficiency, by optimizing delivery
times and by reducing the cost of waiting time at various sites, this PDRMC
model could cut operating costs and increase the company’s revenue because
there will be time for more orders. |
first_indexed | 2024-04-11T02:21:57Z |
format | Article |
id | doaj.art-c36f8f4ad6e14092aef0fc22ea2db819 |
institution | Directory Open Access Journal |
issn | 2086-9614 2087-2100 |
language | English |
last_indexed | 2024-04-11T02:21:57Z |
publishDate | 2016-12-01 |
publisher | Universitas Indonesia |
record_format | Article |
series | International Journal of Technology |
spelling | doaj.art-c36f8f4ad6e14092aef0fc22ea2db8192023-01-02T23:35:31ZengUniversitas IndonesiaInternational Journal of Technology2086-96142087-21002016-12-01771163117010.14716/ijtech.v7i7.300300Application of Production Scheduling Techniques for Dispatching Ready-mixed ConcreteKittipong Thawongklang0Ladda Tanwanichkul1Department of Civil Engineering, Faculty of Engineering, Khon Kaen University, Khon Kaen 40002, ThailandDepartment of Civil Engineering, Faculty of Engineering, Khon Kaen University, Khon Kaen 40002, ThailandNowadays, the ready-mixed concrete (RMC) industry plays an important role in construction projects, since it has become one of the mechanisms in construction works and it has become more widely used than in the past. Increasing efficiency is focused on in order to be competitive in business. Therefore, this study aims to increase efficiency of the delivery management system by using the modeling of production planning and management of daily scheduling and dispatching of ready-mixed concrete trucks in order to solve the bottleneck problems of production, which are consequently affecting the RMC delivery process .In fact, the capacity of ready-mixed concrete machines seems to be a limitation, since concrete can only be mixed and then delivered in batches, one vehicle at a time. Earliest Due Date (EDD) and First-Come, First-Served (FCFS) are two techniques of priority rules used for RMC scheduling in providing more precision and accuracy of related inputs which can be used in order improve efficiency of the entire RMC process. In the model, factors affecting the RMC delivery process, such as distances, travel speed and travel times are determined by using GIS–Geographic Information Systems software (ArcGIS). The mapping data is also input into the construction site data, which then builds a model based on priority rules to determine the production and dispatching schedule. Preliminary results from the model indicated that delivery delays can be reduced, in addition to improving daily scheduling and reducing planning time. Moreover, the Single Machine-Multiple Sites model was applied to a concrete truck freight management company that had only one manufacturing machine and it had to deliver to several construction sites in various urban areas. By improving efficiency, by optimizing delivery times and by reducing the cost of waiting time at various sites, this PDRMC model could cut operating costs and increase the company’s revenue because there will be time for more orders.http://ijtech.eng.ui.ac.id/article/view/300Come-First ServeDispatchingEarliest Due DateFirst Ready-mixed ConcreteSchedule |
spellingShingle | Kittipong Thawongklang Ladda Tanwanichkul Application of Production Scheduling Techniques for Dispatching Ready-mixed Concrete International Journal of Technology Come-First Serve Dispatching Earliest Due Date First Ready-mixed Concrete Schedule |
title | Application of Production Scheduling Techniques for Dispatching Ready-mixed Concrete |
title_full | Application of Production Scheduling Techniques for Dispatching Ready-mixed Concrete |
title_fullStr | Application of Production Scheduling Techniques for Dispatching Ready-mixed Concrete |
title_full_unstemmed | Application of Production Scheduling Techniques for Dispatching Ready-mixed Concrete |
title_short | Application of Production Scheduling Techniques for Dispatching Ready-mixed Concrete |
title_sort | application of production scheduling techniques for dispatching ready mixed concrete |
topic | Come-First Serve Dispatching Earliest Due Date First Ready-mixed Concrete Schedule |
url | http://ijtech.eng.ui.ac.id/article/view/300 |
work_keys_str_mv | AT kittipongthawongklang applicationofproductionschedulingtechniquesfordispatchingreadymixedconcrete AT laddatanwanichkul applicationofproductionschedulingtechniquesfordispatchingreadymixedconcrete |