Penjadwalan Pembangkit Termal dengan Improved Lagrange Relaxation pada Sistem Jamali - 500 kV
Unit Commitment (UC) is a problem to schedule generating units in a power system economically meeting the requirements of load demand and spinning reserve. Up to now several methods have been applied to solve this problem. Among those methods Lagrange Relaxation (LR) seems to be the most suitable on...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Departement of Electrical Engineering, Faculty of Engineering, Universitas Brawijaya
2018-01-01
|
Series: | Jurnal EECCIS (Electrics, Electronics, Communications, Controls, Informatics, Systems) |
Online Access: | https://jurnaleeccis.ub.ac.id/index.php/eeccis/article/view/336 |
_version_ | 1797640009801531392 |
---|---|
author | inas sunaryanti ningsih Hadi Suyono Wijono Wijono |
author_facet | inas sunaryanti ningsih Hadi Suyono Wijono Wijono |
author_sort | inas sunaryanti ningsih |
collection | DOAJ |
description | Unit Commitment (UC) is a problem to schedule generating units in a power system economically meeting the requirements of load demand and spinning reserve. Up to now several methods have been applied to solve this problem. Among those methods Lagrange Relaxation (LR) seems to be the most suitable one. However, this method may suffer from numerical convergence problem. This paper proposes a new method for solving UC problem. The proposed method uses Evolutionary Programming (EP) to update Lagrange multipliers and improves the performance of LR method. Simulation results show that the proposed method can provide a better solution compared with another methods. |
first_indexed | 2024-03-11T13:25:46Z |
format | Article |
id | doaj.art-c5e2fa8f43984612a5181039a0fce821 |
institution | Directory Open Access Journal |
issn | 2460-8122 |
language | English |
last_indexed | 2024-03-11T13:25:46Z |
publishDate | 2018-01-01 |
publisher | Departement of Electrical Engineering, Faculty of Engineering, Universitas Brawijaya |
record_format | Article |
series | Jurnal EECCIS (Electrics, Electronics, Communications, Controls, Informatics, Systems) |
spelling | doaj.art-c5e2fa8f43984612a5181039a0fce8212023-11-03T07:20:29ZengDepartement of Electrical Engineering, Faculty of Engineering, Universitas BrawijayaJurnal EECCIS (Electrics, Electronics, Communications, Controls, Informatics, Systems)2460-81222018-01-01112555910.21776/jeeccis.v11i2.336204Penjadwalan Pembangkit Termal dengan Improved Lagrange Relaxation pada Sistem Jamali - 500 kVinas sunaryanti ningsih0Hadi SuyonoWijono Wijonouniversitas Brawijaya MalangUnit Commitment (UC) is a problem to schedule generating units in a power system economically meeting the requirements of load demand and spinning reserve. Up to now several methods have been applied to solve this problem. Among those methods Lagrange Relaxation (LR) seems to be the most suitable one. However, this method may suffer from numerical convergence problem. This paper proposes a new method for solving UC problem. The proposed method uses Evolutionary Programming (EP) to update Lagrange multipliers and improves the performance of LR method. Simulation results show that the proposed method can provide a better solution compared with another methods.https://jurnaleeccis.ub.ac.id/index.php/eeccis/article/view/336 |
spellingShingle | inas sunaryanti ningsih Hadi Suyono Wijono Wijono Penjadwalan Pembangkit Termal dengan Improved Lagrange Relaxation pada Sistem Jamali - 500 kV Jurnal EECCIS (Electrics, Electronics, Communications, Controls, Informatics, Systems) |
title | Penjadwalan Pembangkit Termal dengan Improved Lagrange Relaxation pada Sistem Jamali - 500 kV |
title_full | Penjadwalan Pembangkit Termal dengan Improved Lagrange Relaxation pada Sistem Jamali - 500 kV |
title_fullStr | Penjadwalan Pembangkit Termal dengan Improved Lagrange Relaxation pada Sistem Jamali - 500 kV |
title_full_unstemmed | Penjadwalan Pembangkit Termal dengan Improved Lagrange Relaxation pada Sistem Jamali - 500 kV |
title_short | Penjadwalan Pembangkit Termal dengan Improved Lagrange Relaxation pada Sistem Jamali - 500 kV |
title_sort | penjadwalan pembangkit termal dengan improved lagrange relaxation pada sistem jamali 500 kv |
url | https://jurnaleeccis.ub.ac.id/index.php/eeccis/article/view/336 |
work_keys_str_mv | AT inassunaryantiningsih penjadwalanpembangkittermaldenganimprovedlagrangerelaxationpadasistemjamali500kv AT hadisuyono penjadwalanpembangkittermaldenganimprovedlagrangerelaxationpadasistemjamali500kv AT wijonowijono penjadwalanpembangkittermaldenganimprovedlagrangerelaxationpadasistemjamali500kv |