Implementasi Metode Overall Equipment Effectiveness Berbasis Six Big Losses Guna Mengevaluasi Efektivitas Mesin Packing Semen
Integrated maintenance management is an important factor in maintaining the stability of machine operations in manufacturing companies. PT AAAA Factory Gresik is a cement manufacturing company, where the Section Division of Gresik Finish Mill Packer Operation has a problem of downtime cement packin...
Main Authors: | Septia Priambodo, Nina Aini Mahbubah |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Serambi Mekkah
2021-10-01
|
Series: | Jurnal Serambi Engineering |
Subjects: | |
Online Access: | https://ojs.serambimekkah.ac.id/jse/article/view/3497 |
Similar Items
-
Integration of FMEA method and overall equipment effectiveness to increase effectiveness of TS analyzer machine
by: Welly Atikno, et al.
Published: (2022-06-01) -
Analisis Efektivitas Mesin Injection 2500 Ton di Bagian Produksi PT.XYZ Menggunakan Metode Overall Equipment Effectiveness
by: Sri Widiyanti Putri, et al.
Published: (2022-11-01) -
PENGUKURAN KINERJA MESIN PRODUKSI MENGGUNAKAN METODE OVERALL THROUGHPUT EFFECTIVENESS GUNA MENINGKATKAN HASIL PRODUKSI DI PT XYZ
by: Sigit Wahono, et al.
Published: (2017-10-01) -
PENERAPAN METODE OVERALL EQUIPMENTS EFFECTIVENESS (OEE) DALAM MENINGKATKAN EFEKTIFITAS MESIN/ALAT PABRIK SUSU
by: Achmad Misbah, et al.
Published: (2017-07-01) -
Anatomization of the overall equipment effectiveness (OEE) for various machines in a tool and die shop
by: Sagarika Raju, et al.
Published: (2022-05-01)