Main Delay Factors of Implementation EPC Construction Projects in Iraq

This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in...

Full description

Bibliographic Details
Main Authors: Noor H. Khairullah, Mustafa A. Hilal, Abbas M. Burhan
Format: Article
Language:English
Published: University of Baghdad 2023-10-01
Series:Journal of Engineering
Subjects:
Online Access:https://joe.uobaghdad.edu.iq/index.php/main/article/view/1847
_version_ 1797635626376364032
author Noor H. Khairullah
Mustafa A. Hilal
Abbas M. Burhan
author_facet Noor H. Khairullah
Mustafa A. Hilal
Abbas M. Burhan
author_sort Noor H. Khairullah
collection DOAJ
description This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years. After conducting a descriptive statistical analysis of the data obtained through a field survey and interviews with individuals working in the construction sector with experience in their field. The most important 10 factors were identified from a list of 51 delay factors (distributed according to the questionnaire forms) with a high RII. These factors were related to the delay in the payment of the contractor's dues, the delay in processing materials, the issuance of new instructions and regulations, the delay in obtaining official approvals from the relevant authorities, Errors in designs or contracting documents, lack of cooperation between the contracting parties, and multiple spare orders for reasons belonging to the employer. The article also included the most important suggestions that contribute to reducing the delay in completing projects.
first_indexed 2024-03-11T12:23:05Z
format Article
id doaj.art-c68181e38f824230ae533be60d6f3074
institution Directory Open Access Journal
issn 1726-4073
2520-3339
language English
last_indexed 2024-03-11T12:23:05Z
publishDate 2023-10-01
publisher University of Baghdad
record_format Article
series Journal of Engineering
spelling doaj.art-c68181e38f824230ae533be60d6f30742023-11-06T19:20:28ZengUniversity of BaghdadJournal of Engineering1726-40732520-33392023-10-01291010.31026/j.eng.2023.10.12Main Delay Factors of Implementation EPC Construction Projects in IraqNoor H. Khairullah0Mustafa A. Hilal1Abbas M. Burhan2University of Baghdad, Engineering CollegeUniversity of Baghdad- College of EngineeringUniversity of Baghdad- College of Engineering This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years. After conducting a descriptive statistical analysis of the data obtained through a field survey and interviews with individuals working in the construction sector with experience in their field. The most important 10 factors were identified from a list of 51 delay factors (distributed according to the questionnaire forms) with a high RII. These factors were related to the delay in the payment of the contractor's dues, the delay in processing materials, the issuance of new instructions and regulations, the delay in obtaining official approvals from the relevant authorities, Errors in designs or contracting documents, lack of cooperation between the contracting parties, and multiple spare orders for reasons belonging to the employer. The article also included the most important suggestions that contribute to reducing the delay in completing projects. https://joe.uobaghdad.edu.iq/index.php/main/article/view/1847EPCDelayConstructionProjectsObstacles
spellingShingle Noor H. Khairullah
Mustafa A. Hilal
Abbas M. Burhan
Main Delay Factors of Implementation EPC Construction Projects in Iraq
Journal of Engineering
EPC
Delay
Construction
Projects
Obstacles
title Main Delay Factors of Implementation EPC Construction Projects in Iraq
title_full Main Delay Factors of Implementation EPC Construction Projects in Iraq
title_fullStr Main Delay Factors of Implementation EPC Construction Projects in Iraq
title_full_unstemmed Main Delay Factors of Implementation EPC Construction Projects in Iraq
title_short Main Delay Factors of Implementation EPC Construction Projects in Iraq
title_sort main delay factors of implementation epc construction projects in iraq
topic EPC
Delay
Construction
Projects
Obstacles
url https://joe.uobaghdad.edu.iq/index.php/main/article/view/1847
work_keys_str_mv AT noorhkhairullah maindelayfactorsofimplementationepcconstructionprojectsiniraq
AT mustafaahilal maindelayfactorsofimplementationepcconstructionprojectsiniraq
AT abbasmburhan maindelayfactorsofimplementationepcconstructionprojectsiniraq