Comparison of High-Strength Steel Pipe and H-Shaped Steel in the Strut of a Braced Wall System
Excavation work accounts for a high percentage of the total building construction cost. The most widely used method for excavation work in an urban area is a braced wall system with struts or rakers. H-shaped steel, which is the most commonly used component for struts in braced wall systems, has dis...
Main Authors: | Sangyong Kim, Seoung-Wook Whang, Young-Do Lee, Yoonseok Shin, Gwang-Hee Kim |
---|---|
Format: | Article |
Language: | English |
Published: |
Taylor & Francis Group
2017-01-01
|
Series: | Journal of Asian Architecture and Building Engineering |
Subjects: | |
Online Access: | http://dx.doi.org/10.3130/jaabe.16.179 |
Similar Items
-
Strut Confinement of Simply Supports Deep Beam Using Strut Reinforcement
by: Eyad Sayhood, et al.
Published: (2020-04-01) -
Shear Bearing Capacity of Steel-Fiber-Reinforced Concrete Shear Wall under Low-Cycle Repeated Loading Based on the Softened Strut-and-Tie Model
by: Peibo You, et al.
Published: (2023-12-01) -
Struts : the complete reference /
by: 416383 Holmes, James
Published: (2004) -
Metal props and struts
by: 8096 British Standards Institution -
Struts : the complete reference /
by: 416383 Holmes, James
Published: (2007)