OFF-PEAK WATER DISPERSAL BASED ON STEAM SELECTING OF NPP ENERGY BLOCKS WITH PWR

The article considers the combination of a nuclear power plant (NPP) with water-cooled water reactors (WCWR) and a distillation desalination plant (DDP) with a horizontal-tube film evaporator (HTFE), their joint operation during periods of covering the dips of electric load schedules and thermo-econ...

Full description

Bibliographic Details
Main Authors: V. A. Khrustalev, B. M. Suchkov
Format: Article
Language:English
Published: Kazan State Power Engineering University 2018-05-01
Series:Известия высших учебных заведений: Проблемы энергетики
Subjects:
Online Access:https://www.energyret.ru/jour/article/view/563
_version_ 1797705079022682112
author V. A. Khrustalev
B. M. Suchkov
author_facet V. A. Khrustalev
B. M. Suchkov
author_sort V. A. Khrustalev
collection DOAJ
description The article considers the combination of a nuclear power plant (NPP) with water-cooled water reactors (WCWR) and a distillation desalination plant (DDP) with a horizontal-tube film evaporator (HTFE), their joint operation during periods of covering the dips of electric load schedules and thermo-economic efficiency. A number of advantages are presented in comparison with other methods of desalination, technical characteristics and cost of the DDP with a HTFE of made in Russia series, taking into account the costs not included (construction works, work on sea water supply, electric power, brine distillate, distillate). Such an energy complex makes it possible to increase the capacity factor of a nuclear reactor, as well as to solve the problem of lack of fresh water. The thermo-economic efficiency of this energy complex can be determined both by the complete and simplified algorithm by introducing the "thermo-economic index". Wherein the multi-product energy complex with steam supply from the turbine of the nuclear power plant to the DDP with HTFE should be compared with the version of work from special steam boiler plants (SBP). When analyzing the results of calculations using a simplified algorithm based on the thermo-economic index, the effect of the distillate cost factor on the market is noticeable, as well as the less efficient operation of the desalination plant fed with steam from the SBP as opposed to the steam extraction from the nuclear power plant, especially with increasing the number of hours of operation of the DDP of the HTFE.
first_indexed 2024-03-12T05:31:09Z
format Article
id doaj.art-c712bbd4f5c145f5ab917975817567c2
institution Directory Open Access Journal
issn 1998-9903
language English
last_indexed 2024-03-12T05:31:09Z
publishDate 2018-05-01
publisher Kazan State Power Engineering University
record_format Article
series Известия высших учебных заведений: Проблемы энергетики
spelling doaj.art-c712bbd4f5c145f5ab917975817567c22023-09-03T06:54:10ZengKazan State Power Engineering UniversityИзвестия высших учебных заведений: Проблемы энергетики1998-99032018-05-01203-4233510.30724/1998-9903-2018-20-3-4-23-35472OFF-PEAK WATER DISPERSAL BASED ON STEAM SELECTING OF NPP ENERGY BLOCKS WITH PWRV. A. Khrustalev0B. M. Suchkov1Yuri Gagarin State Technical University of SaratovYuri Gagarin State Technical University of SaratovThe article considers the combination of a nuclear power plant (NPP) with water-cooled water reactors (WCWR) and a distillation desalination plant (DDP) with a horizontal-tube film evaporator (HTFE), their joint operation during periods of covering the dips of electric load schedules and thermo-economic efficiency. A number of advantages are presented in comparison with other methods of desalination, technical characteristics and cost of the DDP with a HTFE of made in Russia series, taking into account the costs not included (construction works, work on sea water supply, electric power, brine distillate, distillate). Such an energy complex makes it possible to increase the capacity factor of a nuclear reactor, as well as to solve the problem of lack of fresh water. The thermo-economic efficiency of this energy complex can be determined both by the complete and simplified algorithm by introducing the "thermo-economic index". Wherein the multi-product energy complex with steam supply from the turbine of the nuclear power plant to the DDP with HTFE should be compared with the version of work from special steam boiler plants (SBP). When analyzing the results of calculations using a simplified algorithm based on the thermo-economic index, the effect of the distillate cost factor on the market is noticeable, as well as the less efficient operation of the desalination plant fed with steam from the SBP as opposed to the steam extraction from the nuclear power plant, especially with increasing the number of hours of operation of the DDP of the HTFE.https://www.energyret.ru/jour/article/view/563nuclear power stationwater desalinationdesalination plantnet present valuethermoeconomic index
spellingShingle V. A. Khrustalev
B. M. Suchkov
OFF-PEAK WATER DISPERSAL BASED ON STEAM SELECTING OF NPP ENERGY BLOCKS WITH PWR
Известия высших учебных заведений: Проблемы энергетики
nuclear power station
water desalination
desalination plant
net present value
thermoeconomic index
title OFF-PEAK WATER DISPERSAL BASED ON STEAM SELECTING OF NPP ENERGY BLOCKS WITH PWR
title_full OFF-PEAK WATER DISPERSAL BASED ON STEAM SELECTING OF NPP ENERGY BLOCKS WITH PWR
title_fullStr OFF-PEAK WATER DISPERSAL BASED ON STEAM SELECTING OF NPP ENERGY BLOCKS WITH PWR
title_full_unstemmed OFF-PEAK WATER DISPERSAL BASED ON STEAM SELECTING OF NPP ENERGY BLOCKS WITH PWR
title_short OFF-PEAK WATER DISPERSAL BASED ON STEAM SELECTING OF NPP ENERGY BLOCKS WITH PWR
title_sort off peak water dispersal based on steam selecting of npp energy blocks with pwr
topic nuclear power station
water desalination
desalination plant
net present value
thermoeconomic index
url https://www.energyret.ru/jour/article/view/563
work_keys_str_mv AT vakhrustalev offpeakwaterdispersalbasedonsteamselectingofnppenergyblockswithpwr
AT bmsuchkov offpeakwaterdispersalbasedonsteamselectingofnppenergyblockswithpwr