Complete / Incomplete Hierarchical Hub Center Single Assignment Network Problem
In this paper we present the problem of designing a three level hub center network. In our network, the top level consists of a complete network where a direct link is between all central hubs. The second and third levels consist of star networks that connect the hubs to central hubs and the demand...
Main Authors: | Alireza Arshadi Khamseh, Mohammad Doost Mohamadi |
---|---|
Format: | Article |
Language: | English |
Published: |
Islamic Azad University, Qazvin Branch
2014-03-01
|
Series: | Journal of Optimization in Industrial Engineering |
Subjects: | |
Online Access: | http://www.qjie.ir/article_147_b31d2a41671ff90544c70fc81ebd1daa.pdf |
Similar Items
-
Uncertain Programming Models for Sustainable Hub Covering Location Problem Over Incomplete Network
by: Junbin Wang, et al.
Published: (2021-01-01) -
Hierarchical Passenger Hub Location Problem in a Megaregion Area Considering Service Availability
by: Huang Yan, et al.
Published: (2021-03-01) -
Design of a Bi-Objective Capacitated Single-Allocation Incomplete Hub Network Considering an Elastic Demand
by: Firoozeh Kaveh, et al.
Published: (2016-12-01) -
Multi-modal and multi-product hierarchical hub location under uncertainty
by: Mahdi Shahin, et al.
Published: (2017-02-01) -
Variable Neighborhood Search Algorithm for the Single Assignment Incomplete Hub Location Problem with Modular Capacities and Direct Connections
by: Raed AL Athamneh, et al.
Published: (2023-12-01)