Failure Investigation of under Construction Prestressed Concrete Bridge in Chitwan, Nepal
On 6 April 2021, a 200 m-long under-construction prestressed concrete bridge failed in the Chitwan District in central Nepal. Two of the four bridge spans collapsed without any notable evidence of dynamic force application. Under-construction bridge failures are sometimes reported and can have a sig...
Main Authors: | Rabindra Adhikari, Pratyush Jha, Lalit Bhatt, Dipesh Thapa, Davide Forcellini, Dipendra Gautam |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-01-01
|
Series: | Infrastructures |
Subjects: | |
Online Access: | https://www.mdpi.com/2412-3811/7/2/14 |
Similar Items
-
Failure investigation of a propped cantilever truss bridge
by: Rabindra Adhikari, et al.
Published: (2024-02-01) -
Handbook for prestressed concrete bridges/
by: Sarkar, S.
Published: (1969) -
Prestressed concrete bridges : design and construction /
by: 200012 Hewson , Nigel R.
Published: (2004) -
Laboratory tests for load distribution in a manual prestressed bridge/
by: 290766 Little, G., et al.
Published: (1954) -
Construction and design of prestressed concrete segmental bridges /
by: 315763 Podolny, Walter, et al.
Published: (1982)