Improving Design Quality by Contractor Involvement: An Empirical Study on Effects
It is generally acknowledged that good-quality design is a prerequisite for good quality and productive construction work. One proposed measure to improve the quality of construction has been contractors’ involvement in the design phase, and this phenomenon has been studied by several researchers. H...
Main Authors: | Eelon Lappalainen, Petteri Uusitalo, Ergo Pikas, Olli Seppänen, Antti Peltokorpi, Petri Uusitalo, Ana Reinbold, Nikolai Menzhinskii |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-08-01
|
Series: | Buildings |
Subjects: | |
Online Access: | https://www.mdpi.com/2075-5309/12/8/1188 |
Similar Items
-
Applying Level of Detail in a BIM-Based Project: An Overall Process for Lean Design Management
by: Petteri Uusitalo, et al.
Published: (2019-05-01) -
Combining decentralized decision-making and takt production in construction planning and control to increase production flow
by: Joonas Lehtovaara, et al.
Published: (2022-09-01) -
The strategies of Malaysian contractors involvement in international project /
by: Muhammad Izat Ishak, 1986- , author, et al.
Published: (2015) -
The strategies of Malaysian contractors involvement in international project [electronic resource] /
by: Muhammad Izat Ishak, 1986- , author, et al.
Published: (2015) -
Liability of the specialist contractor in construction work /
by: Joharudin Samion, 1974-, et al.
Published: (2008)