Monitoring and Analysis of Geotemperature during the Tunnel Construction
High geotemperatures are encountered during tunnel construction in areas with complex geological structures, which can seriously affect personnel and equipment in the process of tunnel construction and operation. The Nige tunnel, a deep-buried extra-long tunnel, was selected to monitor the geotemper...
Main Authors: | Tao Wen, Zheng Hu, Yankun Wang, Zihan Zhang, Jinshan Sun |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-01-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/15/3/736 |
Similar Items
-
Review of Research Progresses and Application of Geothermal Disaster Prevention on Large-Buried Tunnels
by: Yifan Chen, et al.
Published: (2022-10-01) -
Simulation achievement of lab-scale formations with high geotemperature gradient
by: Deqian ZHANG, et al.
Published: (2023-01-01) -
Variation Law of Air Temperature of a High-Geotemperature Tunnel during the Construction
by: Tao Wen, et al.
Published: (2022-02-01) -
Analysis of Influencing Factors on Soil Heat Storage and Release Potential in Long Period Evolution of Subway Tunnel
by: Wang Lihui, et al.
Published: (2020-01-01) -
Distribution Law of the Initial Temperature Field in a Railway Tunnel with High Rock Temperature: A Model Test and Numerical Analysis
by: Shoubang Sun, et al.
Published: (2023-01-01)