Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system
This study uses an alternative fabrication scheme to study the effect of rework of nonconforming items and delayed differentiation on a multiproduct supply-chain system. Traditional economic production quantity model focuses on a single-product inventory system where all products made are assumed to...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Growing Science
2017-07-01
|
Series: | International Journal of Industrial Engineering Computations |
Subjects: | |
Online Access: | http://www.growingscience.com/ijiec/Vol9/IJIEC_2017_20.pdf |
_version_ | 1818048853525397504 |
---|---|
author | Yuan-Shyi Peter Chiu Hong-Dar Lin Mei-Fang Wu Singa Wang Chiu |
author_facet | Yuan-Shyi Peter Chiu Hong-Dar Lin Mei-Fang Wu Singa Wang Chiu |
author_sort | Yuan-Shyi Peter Chiu |
collection | DOAJ |
description | This study uses an alternative fabrication scheme to study the effect of rework of nonconforming items and delayed differentiation on a multiproduct supply-chain system. Traditional economic production quantity model focuses on a single-product inventory system where all products made are assumed to be perfect quality and finished products are issued continuously. To increase machine utilization, lower quality costs in production, and reflect the real-world vendor-buyer integrated systems Chiu et al. (2016a) [Chiu, Y-S.P., Kuo, J-S., Chiu, S. W., Hsieh, Y-T. (2016a). Effect of delayed differentiation on a multiproduct vendor–buyer integrated inventory system with rework. Advances in Production Engineering & Management, 11(4), 333-344.] employed a single-machine two-stage production scheme to study the effects of rework and delayed differentiation on a multi-product supply-chain system. With the intention of further reducing fabrication cycle time, this study considers an alternative two-machine two-stage fabrication scheme to re-explore the problem in Chiu et al. (2016a). Machine one solely produces all common parts for multiple end products. Then, machine two fabricates the customized multiproduct using a common cycle time strategy. Through the use of mathematical modeling and analyses, the optimal production cycle length and distribution policy are derived. Numerical examples are provided to demonstrate practical usage of the research results, and show its significant benefit in reducing fabrication cycle time compared to that obtained from prior studies that used different schemes. |
first_indexed | 2024-12-10T10:28:17Z |
format | Article |
id | doaj.art-c906150ad4044854be3b03bf6dbd0631 |
institution | Directory Open Access Journal |
issn | 1923-2926 1923-2934 |
language | English |
last_indexed | 2024-12-10T10:28:17Z |
publishDate | 2017-07-01 |
publisher | Growing Science |
record_format | Article |
series | International Journal of Industrial Engineering Computations |
spelling | doaj.art-c906150ad4044854be3b03bf6dbd06312022-12-22T01:52:40ZengGrowing ScienceInternational Journal of Industrial Engineering Computations1923-29261923-29342017-07-019223524810.5267/j.ijiec.2017.6.001Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain systemYuan-Shyi Peter ChiuHong-Dar LinMei-Fang WuSinga Wang ChiuThis study uses an alternative fabrication scheme to study the effect of rework of nonconforming items and delayed differentiation on a multiproduct supply-chain system. Traditional economic production quantity model focuses on a single-product inventory system where all products made are assumed to be perfect quality and finished products are issued continuously. To increase machine utilization, lower quality costs in production, and reflect the real-world vendor-buyer integrated systems Chiu et al. (2016a) [Chiu, Y-S.P., Kuo, J-S., Chiu, S. W., Hsieh, Y-T. (2016a). Effect of delayed differentiation on a multiproduct vendor–buyer integrated inventory system with rework. Advances in Production Engineering & Management, 11(4), 333-344.] employed a single-machine two-stage production scheme to study the effects of rework and delayed differentiation on a multi-product supply-chain system. With the intention of further reducing fabrication cycle time, this study considers an alternative two-machine two-stage fabrication scheme to re-explore the problem in Chiu et al. (2016a). Machine one solely produces all common parts for multiple end products. Then, machine two fabricates the customized multiproduct using a common cycle time strategy. Through the use of mathematical modeling and analyses, the optimal production cycle length and distribution policy are derived. Numerical examples are provided to demonstrate practical usage of the research results, and show its significant benefit in reducing fabrication cycle time compared to that obtained from prior studies that used different schemes.http://www.growingscience.com/ijiec/Vol9/IJIEC_2017_20.pdfMultiproduct systemCleaner productionRework of nonconforming itemsDelay product differentiationTwo-machine schemeMulti-delivery plan |
spellingShingle | Yuan-Shyi Peter Chiu Hong-Dar Lin Mei-Fang Wu Singa Wang Chiu Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system International Journal of Industrial Engineering Computations Multiproduct system Cleaner production Rework of nonconforming items Delay product differentiation Two-machine scheme Multi-delivery plan |
title | Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system |
title_full | Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system |
title_fullStr | Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system |
title_full_unstemmed | Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system |
title_short | Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system |
title_sort | alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply chain system |
topic | Multiproduct system Cleaner production Rework of nonconforming items Delay product differentiation Two-machine scheme Multi-delivery plan |
url | http://www.growingscience.com/ijiec/Vol9/IJIEC_2017_20.pdf |
work_keys_str_mv | AT yuanshyipeterchiu alternativefabricationschemetostudyeffectsofreworkofnonconformingproductsanddelayeddifferentiationonamultiproductsupplychainsystem AT hongdarlin alternativefabricationschemetostudyeffectsofreworkofnonconformingproductsanddelayeddifferentiationonamultiproductsupplychainsystem AT meifangwu alternativefabricationschemetostudyeffectsofreworkofnonconformingproductsanddelayeddifferentiationonamultiproductsupplychainsystem AT singawangchiu alternativefabricationschemetostudyeffectsofreworkofnonconformingproductsanddelayeddifferentiationonamultiproductsupplychainsystem |