Minimum-Cost Fast-Charging Infrastructure Planning for Electric Vehicles along the Austrian High-Level Road Network

Given the ongoing transformation of the transport sector toward electrification, expansion of the current charging infrastructure is essential to meet future charging demands. The lack of fast-charging infrastructure along highways and motorways is a particular obstacle for long-distance travel with...

Full description

Bibliographic Details
Main Authors: Antonia Golab, Sebastian Zwickl-Bernhard, Hans Auer
Format: Article
Language:English
Published: MDPI AG 2022-03-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/15/6/2147
_version_ 1797471818367369216
author Antonia Golab
Sebastian Zwickl-Bernhard
Hans Auer
author_facet Antonia Golab
Sebastian Zwickl-Bernhard
Hans Auer
author_sort Antonia Golab
collection DOAJ
description Given the ongoing transformation of the transport sector toward electrification, expansion of the current charging infrastructure is essential to meet future charging demands. The lack of fast-charging infrastructure along highways and motorways is a particular obstacle for long-distance travel with battery electric vehicles (BEVs). In this context, we propose a charging infrastructure allocation model that allocates and sizes fast-charging stations along high-level road networks while minimizing the costs for infrastructure investment. The modeling framework is applied to the Austrian highway and motorway network, and the needed expansion of the current fast-charging infrastructure in place is modeled under different future scenarios for 2030. Within these, the share of BEVs in the car fleet, developments in BEV technology and road traffic load changing in the face of future modal shift effects are altered. In particular, we analyze the change in the requirements for fast-charging infrastructure in response to enhanced driving range and growing BEV fleets. The results indicate that improvements in the driving range of BEVs will have limited impact and hardly affect future costs of the expansion of the fast-charging infrastructure. On the contrary, the improvements in the charging power of BEVs have the potential to reduce future infrastructure costs.
first_indexed 2024-03-09T19:53:29Z
format Article
id doaj.art-c94db479402f464a8cf0f4c343d13cde
institution Directory Open Access Journal
issn 1996-1073
language English
last_indexed 2024-03-09T19:53:29Z
publishDate 2022-03-01
publisher MDPI AG
record_format Article
series Energies
spelling doaj.art-c94db479402f464a8cf0f4c343d13cde2023-11-24T01:05:13ZengMDPI AGEnergies1996-10732022-03-01156214710.3390/en15062147Minimum-Cost Fast-Charging Infrastructure Planning for Electric Vehicles along the Austrian High-Level Road NetworkAntonia Golab0Sebastian Zwickl-Bernhard1Hans Auer2Energy Economy Group (EEG), Technische Universität Wien, Gusshausstraße 25-29, E370-3, 1040 Vienna, AustriaEnergy Economy Group (EEG), Technische Universität Wien, Gusshausstraße 25-29, E370-3, 1040 Vienna, AustriaEnergy Economy Group (EEG), Technische Universität Wien, Gusshausstraße 25-29, E370-3, 1040 Vienna, AustriaGiven the ongoing transformation of the transport sector toward electrification, expansion of the current charging infrastructure is essential to meet future charging demands. The lack of fast-charging infrastructure along highways and motorways is a particular obstacle for long-distance travel with battery electric vehicles (BEVs). In this context, we propose a charging infrastructure allocation model that allocates and sizes fast-charging stations along high-level road networks while minimizing the costs for infrastructure investment. The modeling framework is applied to the Austrian highway and motorway network, and the needed expansion of the current fast-charging infrastructure in place is modeled under different future scenarios for 2030. Within these, the share of BEVs in the car fleet, developments in BEV technology and road traffic load changing in the face of future modal shift effects are altered. In particular, we analyze the change in the requirements for fast-charging infrastructure in response to enhanced driving range and growing BEV fleets. The results indicate that improvements in the driving range of BEVs will have limited impact and hardly affect future costs of the expansion of the fast-charging infrastructure. On the contrary, the improvements in the charging power of BEVs have the potential to reduce future infrastructure costs.https://www.mdpi.com/1996-1073/15/6/2147fast-chargingplacement and sizing of charging stationshighway charging infrastructurelong-distance travelbattery electric vehiclesoptimization model
spellingShingle Antonia Golab
Sebastian Zwickl-Bernhard
Hans Auer
Minimum-Cost Fast-Charging Infrastructure Planning for Electric Vehicles along the Austrian High-Level Road Network
Energies
fast-charging
placement and sizing of charging stations
highway charging infrastructure
long-distance travel
battery electric vehicles
optimization model
title Minimum-Cost Fast-Charging Infrastructure Planning for Electric Vehicles along the Austrian High-Level Road Network
title_full Minimum-Cost Fast-Charging Infrastructure Planning for Electric Vehicles along the Austrian High-Level Road Network
title_fullStr Minimum-Cost Fast-Charging Infrastructure Planning for Electric Vehicles along the Austrian High-Level Road Network
title_full_unstemmed Minimum-Cost Fast-Charging Infrastructure Planning for Electric Vehicles along the Austrian High-Level Road Network
title_short Minimum-Cost Fast-Charging Infrastructure Planning for Electric Vehicles along the Austrian High-Level Road Network
title_sort minimum cost fast charging infrastructure planning for electric vehicles along the austrian high level road network
topic fast-charging
placement and sizing of charging stations
highway charging infrastructure
long-distance travel
battery electric vehicles
optimization model
url https://www.mdpi.com/1996-1073/15/6/2147
work_keys_str_mv AT antoniagolab minimumcostfastcharginginfrastructureplanningforelectricvehiclesalongtheaustrianhighlevelroadnetwork
AT sebastianzwicklbernhard minimumcostfastcharginginfrastructureplanningforelectricvehiclesalongtheaustrianhighlevelroadnetwork
AT hansauer minimumcostfastcharginginfrastructureplanningforelectricvehiclesalongtheaustrianhighlevelroadnetwork