Abandoned Mines: A Feasibility Analysis for Full-Scale Resuscitation of Redwing Gold Mine Operations

Redwing Mine, historically one of the major gold mines in Zimbabwe operated by Metalon Gold has since been on the brink of closure for over five years. Currently, the mine is merely operating at 10% capacity due to the issuing of mining tributes to small-scale and artisanal miners and poor water ma...

Full description

Bibliographic Details
Main Authors: Elia Chipfupi, Desire Runganga, Tatenda Nyamagudza, Charles Chewu, Nomsa Mukudzavu
Format: Article
Language:English
Published: Penteract Technology 2023-05-01
Series:Malaysian Journal of Science and Advanced Technology
Subjects:
Online Access:https://mjsat.com.my/index.php/mjsat/article/view/136
_version_ 1797737045987164160
author Elia Chipfupi
Desire Runganga
Tatenda Nyamagudza
Charles Chewu
Nomsa Mukudzavu
author_facet Elia Chipfupi
Desire Runganga
Tatenda Nyamagudza
Charles Chewu
Nomsa Mukudzavu
author_sort Elia Chipfupi
collection DOAJ
description Redwing Mine, historically one of the major gold mines in Zimbabwe operated by Metalon Gold has since been on the brink of closure for over five years. Currently, the mine is merely operating at 10% capacity due to the issuing of mining tributes to small-scale and artisanal miners and poor water management. The artisanal miners are sterilizing an economically viable gold deposit by employing rudimentary mining techniques targeting high grades hence resuscitating the mine should be of national priority. To increase production, revenue, and accountability, the mine needs to be resuscitated to its full operation based on sound mining engineering and economic principles. Resuscitation of abandoned mines to full operation consist of reserve identification, dewatering, review of the ground support system and production planning. Exploration, water measurements, and geotechnical data collection surveys were done to estimate the reserve, select optimum pumps for dewatering and design a ground support system. Production Plans were developed from Redwing Mine’s plant capacity, available machinery, and historical production data. Development work and operations necessary to be completed before production can begin were derived from survey plans. The restoration program was evaluated using the Net Present Value method and Internal Rate of Return techniques. Results proved that the project is economically feasible with an internal rate of return as high as 71.91%.
first_indexed 2024-03-12T13:22:43Z
format Article
id doaj.art-c9640929e0b74da9927a8c6847969dd0
institution Directory Open Access Journal
issn 2785-8901
language English
last_indexed 2024-03-12T13:22:43Z
publishDate 2023-05-01
publisher Penteract Technology
record_format Article
series Malaysian Journal of Science and Advanced Technology
spelling doaj.art-c9640929e0b74da9927a8c6847969dd02023-08-25T14:41:04ZengPenteract TechnologyMalaysian Journal of Science and Advanced Technology2785-89012023-05-013210.56532/mjsat.v3i2.136136Abandoned Mines: A Feasibility Analysis for Full-Scale Resuscitation of Redwing Gold Mine OperationsElia Chipfupi0Desire Runganga1Tatenda Nyamagudza2Charles Chewu3Nomsa Mukudzavu4Dept. of Mining and Mineral Processing Engineering, Manicaland State University. Mutare, ZimbabweDept. of Mining Engineering, University of Zimbabwe. Harare, ZimbabweDept. of Mining and Mineral Processing Engineering, Manicaland State University. Mutare, ZimbabweDept. of Mining and Mineral Processing Engineering, Manicaland State University. Mutare, ZimbabweDept. of Mining and Mineral Processing Engineering, Manicaland State University. Mutare, Zimbabwe Redwing Mine, historically one of the major gold mines in Zimbabwe operated by Metalon Gold has since been on the brink of closure for over five years. Currently, the mine is merely operating at 10% capacity due to the issuing of mining tributes to small-scale and artisanal miners and poor water management. The artisanal miners are sterilizing an economically viable gold deposit by employing rudimentary mining techniques targeting high grades hence resuscitating the mine should be of national priority. To increase production, revenue, and accountability, the mine needs to be resuscitated to its full operation based on sound mining engineering and economic principles. Resuscitation of abandoned mines to full operation consist of reserve identification, dewatering, review of the ground support system and production planning. Exploration, water measurements, and geotechnical data collection surveys were done to estimate the reserve, select optimum pumps for dewatering and design a ground support system. Production Plans were developed from Redwing Mine’s plant capacity, available machinery, and historical production data. Development work and operations necessary to be completed before production can begin were derived from survey plans. The restoration program was evaluated using the Net Present Value method and Internal Rate of Return techniques. Results proved that the project is economically feasible with an internal rate of return as high as 71.91%. https://mjsat.com.my/index.php/mjsat/article/view/136DewateringMiningResuscitationFeasibility
spellingShingle Elia Chipfupi
Desire Runganga
Tatenda Nyamagudza
Charles Chewu
Nomsa Mukudzavu
Abandoned Mines: A Feasibility Analysis for Full-Scale Resuscitation of Redwing Gold Mine Operations
Malaysian Journal of Science and Advanced Technology
Dewatering
Mining
Resuscitation
Feasibility
title Abandoned Mines: A Feasibility Analysis for Full-Scale Resuscitation of Redwing Gold Mine Operations
title_full Abandoned Mines: A Feasibility Analysis for Full-Scale Resuscitation of Redwing Gold Mine Operations
title_fullStr Abandoned Mines: A Feasibility Analysis for Full-Scale Resuscitation of Redwing Gold Mine Operations
title_full_unstemmed Abandoned Mines: A Feasibility Analysis for Full-Scale Resuscitation of Redwing Gold Mine Operations
title_short Abandoned Mines: A Feasibility Analysis for Full-Scale Resuscitation of Redwing Gold Mine Operations
title_sort abandoned mines a feasibility analysis for full scale resuscitation of redwing gold mine operations
topic Dewatering
Mining
Resuscitation
Feasibility
url https://mjsat.com.my/index.php/mjsat/article/view/136
work_keys_str_mv AT eliachipfupi abandonedminesafeasibilityanalysisforfullscaleresuscitationofredwinggoldmineoperations
AT desirerunganga abandonedminesafeasibilityanalysisforfullscaleresuscitationofredwinggoldmineoperations
AT tatendanyamagudza abandonedminesafeasibilityanalysisforfullscaleresuscitationofredwinggoldmineoperations
AT charleschewu abandonedminesafeasibilityanalysisforfullscaleresuscitationofredwinggoldmineoperations
AT nomsamukudzavu abandonedminesafeasibilityanalysisforfullscaleresuscitationofredwinggoldmineoperations