Load Optimisation of Multiple Boiler System (MBS) via P-graph
Multiple boiler system (MBS) is commonly applied in the industry to cater to the process steam demand reliably and flexibly. Optimising load allocation among the boilers is significant for the routine boiler system efficiency and carbon emission reduction. This aligns with the objective of “RENKEI c...
Main Authors: | Hong An Er, Sharifah Rafidah Wan Alwi, Zainuddin Abdul Manan |
---|---|
Format: | Article |
Language: | English |
Published: |
AIDIC Servizi S.r.l.
2023-10-01
|
Series: | Chemical Engineering Transactions |
Online Access: | https://www.cetjournal.it/index.php/cet/article/view/13579 |
Similar Items
-
Load optimisation of Multiple Boiler System (MBS) via P-graph
by: Hong, An Er, et al.
Published: (2023) -
Simultaneous retrofit of direct and indirect Heat Exchanger Storage Network (HESN) via individual batch process stream mapping
by: Er, Hong An, et al.
Published: (2022) -
Optimisation of cogeneration energy system in an industrial park using cooperative game theory
by: Tay, Zhi Xin, et al.
Published: (2022) -
Optimisation of Cogeneration Energy System in an Industrial Park using Cooperative Game Theory
by: Zhi Xin Tay, et al.
Published: (2022-09-01) -
Targeting multiple water utilities using composite curves
by: Alwi, Sharifah Rafidah W., et al.
Published: (2007)