A Multi-Objective Mathematical Programming Model for Project-Scheduling Optimization Considering Customer Satisfaction in Construction Projects
The aim of this study was to develop a multi-objective mathematical programming model for the trade-off of time, cost, and quality in the project-scheduling problem (PSP) by taking priorities and resource constraints as well as activity preemption into account. First, a small-sized problem instance...
Main Authors: | Mehrnoosh Zohrehvandi, Shakib Zohrehvandi, Mohammad Khalilzadeh, Maghsoud Amiri, Fariborz Jolai, Edmundas Kazimieras Zavadskas, Jurgita Antucheviciene |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2024-01-01
|
Series: | Mathematics |
Subjects: | |
Online Access: | https://www.mdpi.com/2227-7390/12/2/211 |
Similar Items
-
Application of Three Metaheuristic Algorithms to Time-Cost-Quality Trade-Off Project Scheduling Problem for Construction Projects Considering Time Value of Money
by: Omid Kebriyaii, et al.
Published: (2021-12-01) -
A Project-Scheduling and Resource Management Heuristic Algorithm in the Construction of Combined Cycle Power Plant Projects
by: Shakib Zohrehvandi
Published: (2022-02-01) -
Project scheduling and buffer management: A comprehensive review and future directions
by: Shakib Zohrehvandi, et al.
Published: (2022-01-01) -
Multi-Objective Sustainable Closed-Loop Supply Chain Network Design Considering Multiple Products with Different Quality Levels
by: Amirhossein Soon, et al.
Published: (2022-07-01) -
Non-permutation flow shop scheduling problem with preemption-dependent processing time
by: Mohsen Ziaee, et al.
Published: (2016-12-01)