Hazard and Risk Analysis Using Hirarc and Hazop Methods on Erection Girder Work
Superstructure work of the toll flyover construction is one of the works that have a high level of risk, especially when the erection girder work passes over the existing toll road. This study aims to identify hazards on erection girder work using the HIRARC and HAZOP methods. Using these two method...
Main Authors: | Hanum Latifah, Bayu Putra Andi, Prahara Eduardi |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2023-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/25/e3sconf_icobar2023_01005.pdf |
Similar Items
-
Hazard and Risk Analysis of Driven Pile Foundation Works Using HIRARC Method
by: Liandar Stefani, et al.
Published: (2023-01-01) -
Application of Hazard and Operability Analysis (HAZOP) Method for Risk Analysis in CGS Station
by: rajabali hokmabadi, et al.
Published: (2022-07-01) -
Work Safety Risk Analysis Using Hazard And Operability Study (Hazop) And Job Safety Analysis (Jsa) Methods In Cv. Xyz
by: Alivia Putri Trisnayanti, et al.
Published: (2023-01-01) -
Hazard and operability (HAZOP) study at a chemical plant /
by: Syed Rashdan Syed Abdul Rahman, 1984-, et al.
Published: (2009) -
Hazop and hazan : identifying and assessing process industry hazards /
by: 274214 Kletz, Trevor
Published: (1999)