Research on Multiple Pipelines Pullback Force of Trenchless Horizontal Directional Drilling Crossing Project
[Introduction] Trenchless horizontal directional drilling is widely used in power cable line project to cross natural or artificial obstacles at present.Multiple cable protection tubes need to be laid successfully at one time in engineering applications. It is defined as multiple pipelines pulling c...
Main Authors: | CAO Bo, HUANG Longxiang, LUO Yan |
---|---|
Format: | Article |
Language: | English |
Published: |
Energy Observer Magazine Co., Ltd.
2021-12-01
|
Series: | 南方能源建设 |
Subjects: | |
Online Access: | https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2021.04.017 |
Similar Items
-
PROSPECTS FOR DEVELOPMENT OF TECHNOLOGY AND FACILITIES OF PILOT BORES HORIZONTAL DIRECTIONAL DRILLING FOR TRENCHLESS LAYING OF PIPELINES
by: Lev A. Saruev, et al.
Published: (2019-04-01) -
Pipeline design for installation by horizontal directional drilling /
by: Skonberg, Eric R., editor, et al.
Published: ([201) -
Horizontal directional drilling : utility and pipeline applications /
by: 316574 Willoughby, David A.
Published: (2005) -
Importance of drill string assembly swivel in horizontal drilling
by: Edmund Tasak, et al.
Published: (2006-10-01) -
Pullback incremental attraction
by: Kloeden Peter E., et al.
Published: (2014-01-01)