MINErosion 4: Using measurements from a tilting flume-rainfall simulator facility to predict erosion rates from post-mining catchments/landscapes in Central Queensland, Australia

The use of draglines to remove overburden in Queensland opencut mines, results in landscapes that consist of long parallel tertiary overburden spoil-piles that are generally highly saline, dispersive, and highly erodible. The height of these spoil-piles may exceed 50–60 m above the original landscap...

Full description

Bibliographic Details
Main Authors: Ashraf M. Khalifa, Hwat Bing So, Hossein Ghadiri, Chris Carroll, Peter Burger, Bofu Yu
Format: Article
Language:English
Published: KeAi Communications Co., Ltd. 2023-09-01
Series:International Soil and Water Conservation Research
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S2095633923000138
_version_ 1797225444130422784
author Ashraf M. Khalifa
Hwat Bing So
Hossein Ghadiri
Chris Carroll
Peter Burger
Bofu Yu
author_facet Ashraf M. Khalifa
Hwat Bing So
Hossein Ghadiri
Chris Carroll
Peter Burger
Bofu Yu
author_sort Ashraf M. Khalifa
collection DOAJ
description The use of draglines to remove overburden in Queensland opencut mines, results in landscapes that consist of long parallel tertiary overburden spoil-piles that are generally highly saline, dispersive, and highly erodible. The height of these spoil-piles may exceed 50–60 m above the original landscapes and the slopes are at the angle of repose of around 75% or 37°. Legislation and public opinion require that these highly disturbed open-cut post-mining landscapes should be satisfactorily rehabilitated into an approved post-mining land use with acceptable erosion rates. Therefore, these slopes must be reduced before the landscape can be rehabilitated. The most expensive component of the rehabilitation process is the re-shaping and preparation of the overburden to create a suitable landscape for vegetation growth. As soils and overburden varies greatly in their erodibilities, the extent and cost of earthworks can be minimized, and rehabilitation failures avoided, if soil erosion from designed landscapes can be predicted using laboratory-based parameters prior to construction of these landscapes. This paper describes the development of a model for that purpose.A catchment or landscape erosion model MINErosion 4 was developed by upscaling the existing hillslope model MINErosion 3 (So, et al., 2018) and integrate it with both ESRI ArcGIS 10.3 or QGIS 3.16 (freeware), to predict event based and mean annual erosion rate from a postmining catchment or landscape. MINErosion 3 is a model that can be used to predict event and annual erosion rates from field scale hillslopes using laboratory measured erodibility parameters or routinely measured soil physical and chemical properties, and to derive suitable landscape design parameters (slope gradient, slope length and vegetation cover) that will result in acceptable erosion rates. But it cannot be used to predict the sediment delivery from catchments or landscapes. MINErosion 4 was validated against data collected on three instrumented catchments (up to 0.91 ha in size) on the Curragh mine site in Central Queensland. The agreement between predicted (Y) and measured (X) values were very good with the regression equation of Y = 0.92X and an R2 value of 0.81 for individual storm events, and Y = 1.47X and an R2 value of 0.73 for the average annual soil loss. This is probably the first time that a catchment scale erosion is successfully predicted from laboratory measured erodibility parameters.
first_indexed 2024-03-13T02:25:29Z
format Article
id doaj.art-cc79b387d13c4ed480f78afa8fb645d9
institution Directory Open Access Journal
issn 2095-6339
language English
last_indexed 2024-04-24T14:09:06Z
publishDate 2023-09-01
publisher KeAi Communications Co., Ltd.
record_format Article
series International Soil and Water Conservation Research
spelling doaj.art-cc79b387d13c4ed480f78afa8fb645d92024-04-03T09:37:31ZengKeAi Communications Co., Ltd.International Soil and Water Conservation Research2095-63392023-09-01113415428MINErosion 4: Using measurements from a tilting flume-rainfall simulator facility to predict erosion rates from post-mining catchments/landscapes in Central Queensland, AustraliaAshraf M. Khalifa0Hwat Bing So1Hossein Ghadiri2Chris Carroll3Peter Burger4Bofu Yu5School of Engineering and Built Environment, Australian Rivers Institute, Griffith University, Nathan, 4111, Queensland, Australia; Corresponding author.School of Environment and Science, Australian Rivers Institute, Griffith University, Nathan, 4111, Queensland, AustraliaSchool of Environment and Science, Australian Rivers Institute, Griffith University, Nathan, 4111, Queensland, AustraliaSchool of Environment and Science, Australian Rivers Institute, Griffith University, Nathan, 4111, Queensland, Australia; Department of Natural Resources, Mines and Energy, Rockhampton, Queensland, AustraliaDepartment of Natural Resources, Mines and Energy, Rockhampton, Queensland, AustraliaSchool of Engineering and Built Environment, Australian Rivers Institute, Griffith University, Nathan, 4111, Queensland, AustraliaThe use of draglines to remove overburden in Queensland opencut mines, results in landscapes that consist of long parallel tertiary overburden spoil-piles that are generally highly saline, dispersive, and highly erodible. The height of these spoil-piles may exceed 50–60 m above the original landscapes and the slopes are at the angle of repose of around 75% or 37°. Legislation and public opinion require that these highly disturbed open-cut post-mining landscapes should be satisfactorily rehabilitated into an approved post-mining land use with acceptable erosion rates. Therefore, these slopes must be reduced before the landscape can be rehabilitated. The most expensive component of the rehabilitation process is the re-shaping and preparation of the overburden to create a suitable landscape for vegetation growth. As soils and overburden varies greatly in their erodibilities, the extent and cost of earthworks can be minimized, and rehabilitation failures avoided, if soil erosion from designed landscapes can be predicted using laboratory-based parameters prior to construction of these landscapes. This paper describes the development of a model for that purpose.A catchment or landscape erosion model MINErosion 4 was developed by upscaling the existing hillslope model MINErosion 3 (So, et al., 2018) and integrate it with both ESRI ArcGIS 10.3 or QGIS 3.16 (freeware), to predict event based and mean annual erosion rate from a postmining catchment or landscape. MINErosion 3 is a model that can be used to predict event and annual erosion rates from field scale hillslopes using laboratory measured erodibility parameters or routinely measured soil physical and chemical properties, and to derive suitable landscape design parameters (slope gradient, slope length and vegetation cover) that will result in acceptable erosion rates. But it cannot be used to predict the sediment delivery from catchments or landscapes. MINErosion 4 was validated against data collected on three instrumented catchments (up to 0.91 ha in size) on the Curragh mine site in Central Queensland. The agreement between predicted (Y) and measured (X) values were very good with the regression equation of Y = 0.92X and an R2 value of 0.81 for individual storm events, and Y = 1.47X and an R2 value of 0.73 for the average annual soil loss. This is probably the first time that a catchment scale erosion is successfully predicted from laboratory measured erodibility parameters.http://www.sciencedirect.com/science/article/pii/S2095633923000138Soil erosionMINErosion 4 modelErosion from catchmentsPost-mining rehabilitationQueensland
spellingShingle Ashraf M. Khalifa
Hwat Bing So
Hossein Ghadiri
Chris Carroll
Peter Burger
Bofu Yu
MINErosion 4: Using measurements from a tilting flume-rainfall simulator facility to predict erosion rates from post-mining catchments/landscapes in Central Queensland, Australia
International Soil and Water Conservation Research
Soil erosion
MINErosion 4 model
Erosion from catchments
Post-mining rehabilitation
Queensland
title MINErosion 4: Using measurements from a tilting flume-rainfall simulator facility to predict erosion rates from post-mining catchments/landscapes in Central Queensland, Australia
title_full MINErosion 4: Using measurements from a tilting flume-rainfall simulator facility to predict erosion rates from post-mining catchments/landscapes in Central Queensland, Australia
title_fullStr MINErosion 4: Using measurements from a tilting flume-rainfall simulator facility to predict erosion rates from post-mining catchments/landscapes in Central Queensland, Australia
title_full_unstemmed MINErosion 4: Using measurements from a tilting flume-rainfall simulator facility to predict erosion rates from post-mining catchments/landscapes in Central Queensland, Australia
title_short MINErosion 4: Using measurements from a tilting flume-rainfall simulator facility to predict erosion rates from post-mining catchments/landscapes in Central Queensland, Australia
title_sort minerosion 4 using measurements from a tilting flume rainfall simulator facility to predict erosion rates from post mining catchments landscapes in central queensland australia
topic Soil erosion
MINErosion 4 model
Erosion from catchments
Post-mining rehabilitation
Queensland
url http://www.sciencedirect.com/science/article/pii/S2095633923000138
work_keys_str_mv AT ashrafmkhalifa minerosion4usingmeasurementsfromatiltingflumerainfallsimulatorfacilitytopredicterosionratesfrompostminingcatchmentslandscapesincentralqueenslandaustralia
AT hwatbingso minerosion4usingmeasurementsfromatiltingflumerainfallsimulatorfacilitytopredicterosionratesfrompostminingcatchmentslandscapesincentralqueenslandaustralia
AT hosseinghadiri minerosion4usingmeasurementsfromatiltingflumerainfallsimulatorfacilitytopredicterosionratesfrompostminingcatchmentslandscapesincentralqueenslandaustralia
AT chriscarroll minerosion4usingmeasurementsfromatiltingflumerainfallsimulatorfacilitytopredicterosionratesfrompostminingcatchmentslandscapesincentralqueenslandaustralia
AT peterburger minerosion4usingmeasurementsfromatiltingflumerainfallsimulatorfacilitytopredicterosionratesfrompostminingcatchmentslandscapesincentralqueenslandaustralia
AT bofuyu minerosion4usingmeasurementsfromatiltingflumerainfallsimulatorfacilitytopredicterosionratesfrompostminingcatchmentslandscapesincentralqueenslandaustralia