The features of three- and four-tier internal dumps capacity calculation with the additional capacity preparation in the dump tiers
The paper deals with the task of increasing the volume of rock placed in the internal dump. For that it is necessary first to analyze the existing technology of internal dumping, and then to determine the height of rock tiers being cut in the transport area. Analyzing the mining on the southern pits...
Main Authors: | Gvozdkova Tatiana, Kuznetsov Eugene, Rudakova Anna, Markov Sergei |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2017-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://doi.org/10.1051/e3sconf/20171501008 |
Similar Items
-
Histogram Method for Determining the Location of the Internal Dump in Coal Open Pits
by: Selyukov Alexei, et al.
Published: (2021-01-01) -
Rationale for Selection of Gear Ratio of Hydromechanical Transmission of Dump Trucks of Extra Heavy Payload Capacity
by: Sergei A. Shishko, et al.
Published: (2016-12-01) -
To ‘dump’ or not to ‘dump’: changing, supporting or distracting behavior
by: Kamaruddin, Azrina, et al.
Published: (2010) -
Second-tier agglomerations of Ural region: The capacity for creative reindustrialization
by: Bugrov Konstantin
Published: (2023-01-01) -
Two-tier power planning considering capacity tariff compensation
by: Wang Sixian, et al.
Published: (2022-01-01)