DESIGN AND BUILD INVENTORY MANAGEMENT INFORMATION SYSTEM USING THE SCRUM METHOD

PT Telkom Akses (PTTA) is a subsidiary of PT Telekomunikasi Indonesia, Tbk (Telkom) which share owned entirely by Telkom. PT Telkom Akses is engaged in the business of providing construction services and network infrastructure management. Data collection manually can result in slow data management...

Full description

Bibliographic Details
Main Authors: Ilham Firman Ashari, Annisa Jufe Aryani, Alief Moehamad Ardhi
Format: Article
Language:English
Published: Universitas Serang Raya 2022-03-01
Series:JSiI (Jurnal Sistem Informasi)
Online Access:https://e-jurnal.lppmunsera.org/index.php/jsii/article/view/4050
_version_ 1797255603370852352
author Ilham Firman Ashari
Annisa Jufe Aryani
Alief Moehamad Ardhi
author_facet Ilham Firman Ashari
Annisa Jufe Aryani
Alief Moehamad Ardhi
author_sort Ilham Firman Ashari
collection DOAJ
description PT Telkom Akses (PTTA) is a subsidiary of PT Telekomunikasi Indonesia, Tbk (Telkom) which share owned entirely by Telkom. PT Telkom Akses is engaged in the business of providing construction services and network infrastructure management. Data collection manually can result in slow data management and will have an impact on the workflow of PT. Telkom Akses 3 Ilir Palembang. There will be a lot of damaged or duplicated data and finding data will be difficult. Therefore, it is necessary to develop a system that can collect data on incoming and outgoing goods, namely a Web-based Inventory System. The development of this inventory system uses the CodeIgniter3 Framework and Scrum methodology. Scrum is one of the methods that uses the Agile principal, which refers to team collaboration, product incremental, and iterative processes to achieve goals. The results of the evaluation of system testing using the black-box testing method show that the developed system can run well and as expected. Hopefully with the present of this system, it can help PT Telkom Akses 3 Ilir Palembang in performing incoming and outgoing goods data collection.   Keyword: Inventroy System, Web, Codeigniter 3, Scrum, BlackBox Testing
first_indexed 2024-04-24T22:08:28Z
format Article
id doaj.art-cd2ca74ae2b74f64809c62767697f429
institution Directory Open Access Journal
issn 2406-7768
2581-2181
language English
last_indexed 2024-04-24T22:08:28Z
publishDate 2022-03-01
publisher Universitas Serang Raya
record_format Article
series JSiI (Jurnal Sistem Informasi)
spelling doaj.art-cd2ca74ae2b74f64809c62767697f4292024-03-20T11:04:01ZengUniversitas Serang RayaJSiI (Jurnal Sistem Informasi)2406-77682581-21812022-03-019110.30656/jsii.v9i1.40504050DESIGN AND BUILD INVENTORY MANAGEMENT INFORMATION SYSTEM USING THE SCRUM METHOD Ilham Firman Ashari0Annisa Jufe Aryani1Alief Moehamad Ardhi2Institut Teknologi SumateraInstitut Teknologi SumateraInstitut Teknologi Sumatera PT Telkom Akses (PTTA) is a subsidiary of PT Telekomunikasi Indonesia, Tbk (Telkom) which share owned entirely by Telkom. PT Telkom Akses is engaged in the business of providing construction services and network infrastructure management. Data collection manually can result in slow data management and will have an impact on the workflow of PT. Telkom Akses 3 Ilir Palembang. There will be a lot of damaged or duplicated data and finding data will be difficult. Therefore, it is necessary to develop a system that can collect data on incoming and outgoing goods, namely a Web-based Inventory System. The development of this inventory system uses the CodeIgniter3 Framework and Scrum methodology. Scrum is one of the methods that uses the Agile principal, which refers to team collaboration, product incremental, and iterative processes to achieve goals. The results of the evaluation of system testing using the black-box testing method show that the developed system can run well and as expected. Hopefully with the present of this system, it can help PT Telkom Akses 3 Ilir Palembang in performing incoming and outgoing goods data collection.   Keyword: Inventroy System, Web, Codeigniter 3, Scrum, BlackBox Testing https://e-jurnal.lppmunsera.org/index.php/jsii/article/view/4050
spellingShingle Ilham Firman Ashari
Annisa Jufe Aryani
Alief Moehamad Ardhi
DESIGN AND BUILD INVENTORY MANAGEMENT INFORMATION SYSTEM USING THE SCRUM METHOD
JSiI (Jurnal Sistem Informasi)
title DESIGN AND BUILD INVENTORY MANAGEMENT INFORMATION SYSTEM USING THE SCRUM METHOD
title_full DESIGN AND BUILD INVENTORY MANAGEMENT INFORMATION SYSTEM USING THE SCRUM METHOD
title_fullStr DESIGN AND BUILD INVENTORY MANAGEMENT INFORMATION SYSTEM USING THE SCRUM METHOD
title_full_unstemmed DESIGN AND BUILD INVENTORY MANAGEMENT INFORMATION SYSTEM USING THE SCRUM METHOD
title_short DESIGN AND BUILD INVENTORY MANAGEMENT INFORMATION SYSTEM USING THE SCRUM METHOD
title_sort design and build inventory management information system using the scrum method
url https://e-jurnal.lppmunsera.org/index.php/jsii/article/view/4050
work_keys_str_mv AT ilhamfirmanashari designandbuildinventorymanagementinformationsystemusingthescrummethod
AT annisajufearyani designandbuildinventorymanagementinformationsystemusingthescrummethod
AT aliefmoehamadardhi designandbuildinventorymanagementinformationsystemusingthescrummethod