Rebar Fabrication Plan to Enhance Production Efficiency for Simultaneous Multiple Projects
A discrete-event simulation (DES) model was developed to enhance the reinforcing bar (rebar) fabrication efficiency for multiple simultaneous projects at different sites. The production volume and procedure of the actual rebar fabrication plant were compared to the simulation model to ensure its acc...
Main Authors: | Eunbin Hong, June-Seong Yi, JeongWook Son, MinYoung Hong, YeEun Jang |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-09-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/12/18/9183 |
Similar Items
-
Special Length Priority Optimization Model: Minimizing Wall Rebar Usage and Cutting Waste
by: Dong-Jin Kim, et al.
Published: (2024-01-01) -
Adhesion to concrete of new types of rebar rolled products for construction
by: Galina E. Okolnikova, et al.
Published: (2020-12-01) -
Reducing Rebar Cutting Waste and Rebar Usage of Beams: A Two-Stage Optimization Algorithm
by: Daniel Darma Widjaja, et al.
Published: (2023-09-01) -
Combined mechanical couplers and special-length-priority algorithm for reducing rebar consumption and cutting waste of beam reinforcement
by: Daniel Darma Widjaja, et al.
Published: (2024-06-01) -
Assessment and Optimization of a Clean and Healthier Fusion Welding Procedure for Rebar in Building Structures
by: Javier Ferreiro-Cabello, et al.
Published: (2020-10-01)