Integrating real-time manufacturing data into a novel serial two-stage adaptive alternate genetic fireworks algorithm for solving stochastic type-II simple assembly line balancing problem
Abstract Due to various interference factors, a pre-planned assembly scheme and its cycle time can be disturbed, resulting in the failure of product delivery on schedule. However, when assembly data of the production line can be obtained in real time, the balance of the assembly line could be dynami...
Main Authors: | Fei Peng, Li Zheng |
---|---|
Format: | Article |
Language: | English |
Published: |
Springer
2023-06-01
|
Series: | Complex & Intelligent Systems |
Subjects: | |
Online Access: | https://doi.org/10.1007/s40747-023-01091-7 |
Similar Items
-
Fireworks
by: 8096 British Standards Institution -
The chemistry of fireworks /
by: 321221 Russell, Michael S., et al.
Published: (2000) -
The Chemistry of Fireworks /
by: 321221 Russell, Michael S.
Published: (2009) -
Model state fireworks law /
by: 8435 National Fire Protection Association (United States) -
Pyrotechnics in Fireworks
by: Hugo Ineichen, et al.
Published: (2004-06-01)