Analysis of the Causes of the Collapse of a Deep-Buried Large Cross-Section of Loess Tunnel and Evaluation of Treatment Measures

To address the problem of the collapse of the roof of the Bailuyuan tunnel during construction, the causes of collapse were analyzed, targeted treatment measures were proposed, and the effects of the treatment measures were evaluated through on-site monitoring and three-dimensional numerical simulat...

Full description

Bibliographic Details
Main Authors: Dengke Wang, Jianjun Luo, Kaiming Shen, Liping Gao, Feilong Li, Lei Wang
Format: Article
Language:English
Published: MDPI AG 2021-12-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/12/1/161
_version_ 1797499664864378880
author Dengke Wang
Jianjun Luo
Kaiming Shen
Liping Gao
Feilong Li
Lei Wang
author_facet Dengke Wang
Jianjun Luo
Kaiming Shen
Liping Gao
Feilong Li
Lei Wang
author_sort Dengke Wang
collection DOAJ
description To address the problem of the collapse of the roof of the Bailuyuan tunnel during construction, the causes of collapse were analyzed, targeted treatment measures were proposed, and the effects of the treatment measures were evaluated through on-site monitoring and three-dimensional numerical simulations. The results showed that the particular characteristics of loess and the synergy of groundwater were the internal causes of the tunnel’s collapse as well as, to a certain extent, atmospheric precipitation. Therefore, the combination of multiple factors contributed to the tunnel’s collapse. Untimely monitoring and measurement, as well as the low initial support parameters, reflect a lack of human understanding of the collapse. Based on the analysis of the causes of the collapse, comprehensive treatment measures for inside and outside the tunnel are proposed, which are shown to be effective and to be capable of preventing the occurrence of further collapses. After the collapse treatment, the measured maximum settlement of the tunnel vault was 65.1 mm, the maximum horizontal convergence was 25 mm, the maximum surrounding rock pressure was 0.56 MPa, and the maximum stress on the steel arch frame was 54.34 MPa. Compared with the original design plan, the vertical stress, horizontal stress, and shear stress of the surrounding rock obtained from numerical simulation after the collapse treatment were greatly reduced, the reduction rate at the vault reached 50%, and the safety factors of the initial support positions after treatment met the specification requirements. The research results can provide engineering guidance for the design and construction of large-section tunnels crossing deep-loess strata, and they are of important engineering significance.
first_indexed 2024-03-10T03:50:40Z
format Article
id doaj.art-ce78f92f4cc04badbe94fa52d0fba970
institution Directory Open Access Journal
issn 2076-3417
language English
last_indexed 2024-03-10T03:50:40Z
publishDate 2021-12-01
publisher MDPI AG
record_format Article
series Applied Sciences
spelling doaj.art-ce78f92f4cc04badbe94fa52d0fba9702023-11-23T11:08:39ZengMDPI AGApplied Sciences2076-34172021-12-0112116110.3390/app12010161Analysis of the Causes of the Collapse of a Deep-Buried Large Cross-Section of Loess Tunnel and Evaluation of Treatment MeasuresDengke Wang0Jianjun Luo1Kaiming Shen2Liping Gao3Feilong Li4Lei Wang5Key Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, ChinaKey Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, ChinaUrban Rail Transit Center, China Academy of Railway Sciences Corporation Limited, Beijing 100081, ChinaKey Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, ChinaKey Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, ChinaKey Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, ChinaTo address the problem of the collapse of the roof of the Bailuyuan tunnel during construction, the causes of collapse were analyzed, targeted treatment measures were proposed, and the effects of the treatment measures were evaluated through on-site monitoring and three-dimensional numerical simulations. The results showed that the particular characteristics of loess and the synergy of groundwater were the internal causes of the tunnel’s collapse as well as, to a certain extent, atmospheric precipitation. Therefore, the combination of multiple factors contributed to the tunnel’s collapse. Untimely monitoring and measurement, as well as the low initial support parameters, reflect a lack of human understanding of the collapse. Based on the analysis of the causes of the collapse, comprehensive treatment measures for inside and outside the tunnel are proposed, which are shown to be effective and to be capable of preventing the occurrence of further collapses. After the collapse treatment, the measured maximum settlement of the tunnel vault was 65.1 mm, the maximum horizontal convergence was 25 mm, the maximum surrounding rock pressure was 0.56 MPa, and the maximum stress on the steel arch frame was 54.34 MPa. Compared with the original design plan, the vertical stress, horizontal stress, and shear stress of the surrounding rock obtained from numerical simulation after the collapse treatment were greatly reduced, the reduction rate at the vault reached 50%, and the safety factors of the initial support positions after treatment met the specification requirements. The research results can provide engineering guidance for the design and construction of large-section tunnels crossing deep-loess strata, and they are of important engineering significance.https://www.mdpi.com/2076-3417/12/1/161deep-buried large-section loess tunnelcollapse and roof fallcauses of collapsetreatment measureseffect evaluation
spellingShingle Dengke Wang
Jianjun Luo
Kaiming Shen
Liping Gao
Feilong Li
Lei Wang
Analysis of the Causes of the Collapse of a Deep-Buried Large Cross-Section of Loess Tunnel and Evaluation of Treatment Measures
Applied Sciences
deep-buried large-section loess tunnel
collapse and roof fall
causes of collapse
treatment measures
effect evaluation
title Analysis of the Causes of the Collapse of a Deep-Buried Large Cross-Section of Loess Tunnel and Evaluation of Treatment Measures
title_full Analysis of the Causes of the Collapse of a Deep-Buried Large Cross-Section of Loess Tunnel and Evaluation of Treatment Measures
title_fullStr Analysis of the Causes of the Collapse of a Deep-Buried Large Cross-Section of Loess Tunnel and Evaluation of Treatment Measures
title_full_unstemmed Analysis of the Causes of the Collapse of a Deep-Buried Large Cross-Section of Loess Tunnel and Evaluation of Treatment Measures
title_short Analysis of the Causes of the Collapse of a Deep-Buried Large Cross-Section of Loess Tunnel and Evaluation of Treatment Measures
title_sort analysis of the causes of the collapse of a deep buried large cross section of loess tunnel and evaluation of treatment measures
topic deep-buried large-section loess tunnel
collapse and roof fall
causes of collapse
treatment measures
effect evaluation
url https://www.mdpi.com/2076-3417/12/1/161
work_keys_str_mv AT dengkewang analysisofthecausesofthecollapseofadeepburiedlargecrosssectionofloesstunnelandevaluationoftreatmentmeasures
AT jianjunluo analysisofthecausesofthecollapseofadeepburiedlargecrosssectionofloesstunnelandevaluationoftreatmentmeasures
AT kaimingshen analysisofthecausesofthecollapseofadeepburiedlargecrosssectionofloesstunnelandevaluationoftreatmentmeasures
AT lipinggao analysisofthecausesofthecollapseofadeepburiedlargecrosssectionofloesstunnelandevaluationoftreatmentmeasures
AT feilongli analysisofthecausesofthecollapseofadeepburiedlargecrosssectionofloesstunnelandevaluationoftreatmentmeasures
AT leiwang analysisofthecausesofthecollapseofadeepburiedlargecrosssectionofloesstunnelandevaluationoftreatmentmeasures