An optimization model for monthly time-step drilling schedule under planned field production
The field production profile over the yearly horizon is planned for a balance between economy, security, and sustainability of energy. An optimal drilling schedule is required to achieve the planned production profile with minimized drilling frequency and summation. In this study, we treat each poss...
Main Authors: | Jingyun Ouyang, Shaoyang Geng, Shuo Zhai |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2024-04-01
|
Series: | Heliyon |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2405844024050102 |
Similar Items
-
Analysis of a Two-Step Gradient Method with Two Momentum Parameters for Strongly Convex Unconstrained Optimization
by: Gerasim V. Krivovichev, et al.
Published: (2024-03-01) -
MaxAFL: Maximizing Code Coverage with a Gradient-Based Optimization Technique
by: Youngjoon Kim, et al.
Published: (2020-12-01) -
Nonlinear optimization algorithm using monotonically increasing quantization resolution
by: Jinwuk Seok, et al.
Published: (2023-02-01) -
Weighted matrix based distributed optimization method for economic dispatch of microgrids via multi-step gradient descent
by: Cong Bai, et al.
Published: (2022-11-01) -
Deep Imitation Learning for Optimal Trajectory Planning and Initial Condition Optimization for an Unstable Dynamic System
by: Bo-Hsun Chen, et al.
Published: (2024-01-01)