ECONOMIC EFFICIENCY OF DETERMINING THE MARKET PRICE OF CONSTRUCTION RESOURCES WITHIN THE LIMITED BUDGET

The article examines the analysis of current prices in the market of building materials, products, structures, machines, and mechanisms (construction resources), which is performed by construction participants. The aim of the article is to study the possibility of achieving the maximum economic effe...

Full description

Bibliographic Details
Main Author: Serhii Sichnyi
Format: Article
Language:English
Published: Izdevnieciba “Baltija Publishing” 2020-12-01
Series:Three Seas Economic Journal
Subjects:
Online Access:http://baltijapublishing.lv/index.php/threeseas/article/view/982
_version_ 1818667891118047232
author Serhii Sichnyi
author_facet Serhii Sichnyi
author_sort Serhii Sichnyi
collection DOAJ
description The article examines the analysis of current prices in the market of building materials, products, structures, machines, and mechanisms (construction resources), which is performed by construction participants. The aim of the article is to study the possibility of achieving the maximum economic effect of the analysis of current prices in the market of construction resources within a limited budget. A universal mathematical approach is proposed to calculate the economic effect of the analysis of current prices in the market of construction resources, which is based on a selective method of the research of the market value of construction resources. The calculations take into account the difference between the real resources presented on the market and the estimated construction resources (resource position of the estimate), between the market price and the estimated market price of the construction resource. While performing the analysis of current prices on the market of construction resources in the given conditions of the limited budget the option to reduce the general list of resources by a selection of the optimum list with an application of methods of discrete optimization is offered. The condition for the formation of an abbreviated list of resources is the maximum economic effect that can be obtained from the analysis of current prices for selected resources. Method of heuristic rules is proposed, which allow to significantly reducing the initial list of resources by a simple analysis of input data. The application of these rules allows to reduce the variability of input data for discrete optimization or not to carry it out at all, because the amount of resources selected with their help satisfies the condition of the budget constraint. Recommendations on the composition of the source data are given – this is the project documentation and/or the market price of construction resources as a basis for comparison and information on the range of market prices (scope of sample variation) for the resources included in the study. In the article there are given examples of the practical application of the technique in the conditions of the construction industry in Ukraine. In general, the proposed approach can be used at all stages of variant BIMdesign, when it is necessary to determine the most optimal composition of structures and resources that meet the requirements for the life cycle of the object. Including under the condition of gradual detailing of constructs (an increase of LOD of the project), during designing, up to resources at a stage “Working project”. The main advantages of the proposed method are universality – it does not depend on the ultimate goal of the results of the customer and / or contractor and scalability – it can be applied to the structure, its individual design, or several resources.
first_indexed 2024-12-17T06:27:37Z
format Article
id doaj.art-cf8b5a3fa2234272adc98b875fe0d5b7
institution Directory Open Access Journal
issn 2661-5150
2661-5290
language English
last_indexed 2024-12-17T06:27:37Z
publishDate 2020-12-01
publisher Izdevnieciba “Baltija Publishing”
record_format Article
series Three Seas Economic Journal
spelling doaj.art-cf8b5a3fa2234272adc98b875fe0d5b72022-12-21T22:00:16ZengIzdevnieciba “Baltija Publishing”Three Seas Economic Journal2661-51502661-52902020-12-011413313810.30525/2661-5150/2020-4-19982ECONOMIC EFFICIENCY OF DETERMINING THE MARKET PRICE OF CONSTRUCTION RESOURCES WITHIN THE LIMITED BUDGETSerhii Sichnyi0“Construction – Modern Technologies”, UkraineThe article examines the analysis of current prices in the market of building materials, products, structures, machines, and mechanisms (construction resources), which is performed by construction participants. The aim of the article is to study the possibility of achieving the maximum economic effect of the analysis of current prices in the market of construction resources within a limited budget. A universal mathematical approach is proposed to calculate the economic effect of the analysis of current prices in the market of construction resources, which is based on a selective method of the research of the market value of construction resources. The calculations take into account the difference between the real resources presented on the market and the estimated construction resources (resource position of the estimate), between the market price and the estimated market price of the construction resource. While performing the analysis of current prices on the market of construction resources in the given conditions of the limited budget the option to reduce the general list of resources by a selection of the optimum list with an application of methods of discrete optimization is offered. The condition for the formation of an abbreviated list of resources is the maximum economic effect that can be obtained from the analysis of current prices for selected resources. Method of heuristic rules is proposed, which allow to significantly reducing the initial list of resources by a simple analysis of input data. The application of these rules allows to reduce the variability of input data for discrete optimization or not to carry it out at all, because the amount of resources selected with their help satisfies the condition of the budget constraint. Recommendations on the composition of the source data are given – this is the project documentation and/or the market price of construction resources as a basis for comparison and information on the range of market prices (scope of sample variation) for the resources included in the study. In the article there are given examples of the practical application of the technique in the conditions of the construction industry in Ukraine. In general, the proposed approach can be used at all stages of variant BIMdesign, when it is necessary to determine the most optimal composition of structures and resources that meet the requirements for the life cycle of the object. Including under the condition of gradual detailing of constructs (an increase of LOD of the project), during designing, up to resources at a stage “Working project”. The main advantages of the proposed method are universality – it does not depend on the ultimate goal of the results of the customer and / or contractor and scalability – it can be applied to the structure, its individual design, or several resources.http://baltijapublishing.lv/index.php/threeseas/article/view/982cost of resources in constructioncost of constructionmarket researchdetermination of market value of construction resourcesanalysis of current prices in the market of construction materialsestimated price of resources
spellingShingle Serhii Sichnyi
ECONOMIC EFFICIENCY OF DETERMINING THE MARKET PRICE OF CONSTRUCTION RESOURCES WITHIN THE LIMITED BUDGET
Three Seas Economic Journal
cost of resources in construction
cost of construction
market research
determination of market value of construction resources
analysis of current prices in the market of construction materials
estimated price of resources
title ECONOMIC EFFICIENCY OF DETERMINING THE MARKET PRICE OF CONSTRUCTION RESOURCES WITHIN THE LIMITED BUDGET
title_full ECONOMIC EFFICIENCY OF DETERMINING THE MARKET PRICE OF CONSTRUCTION RESOURCES WITHIN THE LIMITED BUDGET
title_fullStr ECONOMIC EFFICIENCY OF DETERMINING THE MARKET PRICE OF CONSTRUCTION RESOURCES WITHIN THE LIMITED BUDGET
title_full_unstemmed ECONOMIC EFFICIENCY OF DETERMINING THE MARKET PRICE OF CONSTRUCTION RESOURCES WITHIN THE LIMITED BUDGET
title_short ECONOMIC EFFICIENCY OF DETERMINING THE MARKET PRICE OF CONSTRUCTION RESOURCES WITHIN THE LIMITED BUDGET
title_sort economic efficiency of determining the market price of construction resources within the limited budget
topic cost of resources in construction
cost of construction
market research
determination of market value of construction resources
analysis of current prices in the market of construction materials
estimated price of resources
url http://baltijapublishing.lv/index.php/threeseas/article/view/982
work_keys_str_mv AT serhiisichnyi economicefficiencyofdeterminingthemarketpriceofconstructionresourceswithinthelimitedbudget