Maximizing Distributed Energy Resource Hosting Capacity of Power System in South Korea Using Integrated Feeder, Distribution, and Transmission System

Intermittent power generated from renewable distributed energy resource (DER) can create voltage stability problems in the system during peak power production in the low demand period. Thus, the existing standard for operation and management of the distribution system limits the penetration level of...

Full description

Bibliographic Details
Main Authors: Victor Widiputra, Junhyuk Kong, Yejin Yang, Jaesung Jung, Robert Broadwater
Format: Article
Language:English
Published: MDPI AG 2020-07-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/13/13/3367
_version_ 1797563602393104384
author Victor Widiputra
Junhyuk Kong
Yejin Yang
Jaesung Jung
Robert Broadwater
author_facet Victor Widiputra
Junhyuk Kong
Yejin Yang
Jaesung Jung
Robert Broadwater
author_sort Victor Widiputra
collection DOAJ
description Intermittent power generated from renewable distributed energy resource (DER) can create voltage stability problems in the system during peak power production in the low demand period. Thus, the existing standard for operation and management of the distribution system limits the penetration level of the DER and the amount of load in a power system. In this standard, the hosting capacity of the DER is limited to each feeder at a level where the voltage problem does not occur. South Korea applied this standard, thereby making it hard to achieve its DER target. However, by analyzing the voltage stability of an integrated system, the hosting capacity of DER can be increased. Therefore, in this study, the maximum hosting capacity of DER is determined by analyzing an integrated transmission and distribution system. Moreover, the fast voltage stability index (FVSI) is used to verify the determined hosting capacity of DER. For this, the existing interconnection standard of DER at a feeder, distribution system, and transmission system level is investigated. Subsequently, a Monte Carlo simulation is performed to determine the maximum penetration of the DER at a feeder level, while varying the load according to the standard test system in South Korea. The actual load generation profile is used to simulate system conditions in order to determine the maximum DER hosting capacity.
first_indexed 2024-03-10T18:45:51Z
format Article
id doaj.art-cff6d49da4fb446dadb3123b02157b2c
institution Directory Open Access Journal
issn 1996-1073
language English
last_indexed 2024-03-10T18:45:51Z
publishDate 2020-07-01
publisher MDPI AG
record_format Article
series Energies
spelling doaj.art-cff6d49da4fb446dadb3123b02157b2c2023-11-20T05:32:29ZengMDPI AGEnergies1996-10732020-07-011313336710.3390/en13133367Maximizing Distributed Energy Resource Hosting Capacity of Power System in South Korea Using Integrated Feeder, Distribution, and Transmission SystemVictor Widiputra0Junhyuk Kong1Yejin Yang2Jaesung Jung3Robert Broadwater4Department of Energy Systems Research, Ajou University, Suwon 16499, KoreaDepartment of Energy Systems Research, Ajou University, Suwon 16499, KoreaDepartment of Energy Systems Research, Ajou University, Suwon 16499, KoreaDepartment of Energy Systems Research, Ajou University, Suwon 16499, KoreaDepartment of Electrical and Computer Engineering, Virginia Tech, Blacksburg, VA 24061, USAIntermittent power generated from renewable distributed energy resource (DER) can create voltage stability problems in the system during peak power production in the low demand period. Thus, the existing standard for operation and management of the distribution system limits the penetration level of the DER and the amount of load in a power system. In this standard, the hosting capacity of the DER is limited to each feeder at a level where the voltage problem does not occur. South Korea applied this standard, thereby making it hard to achieve its DER target. However, by analyzing the voltage stability of an integrated system, the hosting capacity of DER can be increased. Therefore, in this study, the maximum hosting capacity of DER is determined by analyzing an integrated transmission and distribution system. Moreover, the fast voltage stability index (FVSI) is used to verify the determined hosting capacity of DER. For this, the existing interconnection standard of DER at a feeder, distribution system, and transmission system level is investigated. Subsequently, a Monte Carlo simulation is performed to determine the maximum penetration of the DER at a feeder level, while varying the load according to the standard test system in South Korea. The actual load generation profile is used to simulate system conditions in order to determine the maximum DER hosting capacity.https://www.mdpi.com/1996-1073/13/13/3367distributed energy resource (DER)fast voltage stability index (FVSI)Monte Carlo Simulation (MCS)
spellingShingle Victor Widiputra
Junhyuk Kong
Yejin Yang
Jaesung Jung
Robert Broadwater
Maximizing Distributed Energy Resource Hosting Capacity of Power System in South Korea Using Integrated Feeder, Distribution, and Transmission System
Energies
distributed energy resource (DER)
fast voltage stability index (FVSI)
Monte Carlo Simulation (MCS)
title Maximizing Distributed Energy Resource Hosting Capacity of Power System in South Korea Using Integrated Feeder, Distribution, and Transmission System
title_full Maximizing Distributed Energy Resource Hosting Capacity of Power System in South Korea Using Integrated Feeder, Distribution, and Transmission System
title_fullStr Maximizing Distributed Energy Resource Hosting Capacity of Power System in South Korea Using Integrated Feeder, Distribution, and Transmission System
title_full_unstemmed Maximizing Distributed Energy Resource Hosting Capacity of Power System in South Korea Using Integrated Feeder, Distribution, and Transmission System
title_short Maximizing Distributed Energy Resource Hosting Capacity of Power System in South Korea Using Integrated Feeder, Distribution, and Transmission System
title_sort maximizing distributed energy resource hosting capacity of power system in south korea using integrated feeder distribution and transmission system
topic distributed energy resource (DER)
fast voltage stability index (FVSI)
Monte Carlo Simulation (MCS)
url https://www.mdpi.com/1996-1073/13/13/3367
work_keys_str_mv AT victorwidiputra maximizingdistributedenergyresourcehostingcapacityofpowersysteminsouthkoreausingintegratedfeederdistributionandtransmissionsystem
AT junhyukkong maximizingdistributedenergyresourcehostingcapacityofpowersysteminsouthkoreausingintegratedfeederdistributionandtransmissionsystem
AT yejinyang maximizingdistributedenergyresourcehostingcapacityofpowersysteminsouthkoreausingintegratedfeederdistributionandtransmissionsystem
AT jaesungjung maximizingdistributedenergyresourcehostingcapacityofpowersysteminsouthkoreausingintegratedfeederdistributionandtransmissionsystem
AT robertbroadwater maximizingdistributedenergyresourcehostingcapacityofpowersysteminsouthkoreausingintegratedfeederdistributionandtransmissionsystem