Improving Time-Cost Balance in Critical Path Method (CPM) Using Dragonfly Algorithm (DA)
The CPM (critical path method) technique is to search out the longest path to try and do activities, so as to compress and cut back the time it takes for a project, which finally ends up inside the creation of an identical and intensive network of activities inside the targeted work. This formal ran...
Main Authors: | Mohmmad Anvar Adibhesami, Ahmad Ekhlassi, Ali Mohammad Mosadeghrad, Amirhossein Mohebifar |
---|---|
Format: | Article |
Language: | English |
Published: |
Iran University of Science & Technology
2019-06-01
|
Series: | International Journal of Industrial Engineering and Production Research |
Subjects: | |
Online Access: | http://ijiepr.iust.ac.ir/article-1-883-en.html |
Similar Items
-
Dragonflies and Damselflies of the West /
by: Paulson, Dennis R. author 520654
Published: (2009) -
The Application of Critical Path Method (CPM) in Education Planning at Madrasah Ibtidaiyah
by: Fachruddin Azmi, et al.
Published: (2022-10-01) -
Penggunaan critical path method (CPM) untuk evaluasi waktu dan biaya pelaksanaan proyek
by: Adde Currie Siregar, et al.
Published: (2019-11-01) -
Sustainable Green City Development Project Analysis using the Critical Path Method (CPM) and the Crashing Project Method on Time and Cost Optimization
by: Khaled Abuhasel
Published: (2023-06-01) -
Dragonfly Algorithm and Its Hybrids: A Survey on Performance, Objectives and Applications
by: Bibi Aamirah Shafaa Emambocus, et al.
Published: (2021-11-01)