A method for the solution of the homogeneous inventory-production optimisation problem

The subject of this paper is the inventory-production problem, which is a one of the optimization problems in a decision area in which inventory volume and production volume are considered together. There are many approaches to this problem but for the first time, this problem is modelled by means o...

Full description

Bibliographic Details
Main Author: Schiff Krzysztof
Format: Article
Language:English
Published: Sciendo 2020-01-01
Series:Technical Transactions
Subjects:
Online Access:https://doi.org/10.37705/TechTrans/e2020016
_version_ 1797387218182995968
author Schiff Krzysztof
author_facet Schiff Krzysztof
author_sort Schiff Krzysztof
collection DOAJ
description The subject of this paper is the inventory-production problem, which is a one of the optimization problems in a decision area in which inventory volume and production volume are considered together. There are many approaches to this problem but for the first time, this problem is modelled by means of a capacitated graph network and a solution to the problem is proposed on the basis of this model which consists of finding the maximum flow with the minimum sum of production and inventory cost. In this article, only a solution for one kind of product for the deterministic inventory-production optimisation problem is presented and for this one kind of product, a maximum flow with a minimum cost for each considered demand period is calculated. The maximum flow with minimum cost is a solution to the homogenous inventory-production optimisation problem. The solution to the one kind of product for the inventory-production problem consist of maximum flow with minimum cost for a total demand from all periods, which has been taken into consideration.
first_indexed 2024-03-08T22:20:39Z
format Article
id doaj.art-d11bdc23ed85477faa1d404c9008ddc0
institution Directory Open Access Journal
issn 2353-737X
language English
last_indexed 2024-03-08T22:20:39Z
publishDate 2020-01-01
publisher Sciendo
record_format Article
series Technical Transactions
spelling doaj.art-d11bdc23ed85477faa1d404c9008ddc02023-12-18T12:46:11ZengSciendoTechnical Transactions2353-737X2020-01-01117110.37705/TechTrans/e2020016A method for the solution of the homogeneous inventory-production optimisation problemSchiff Krzysztof0Institute of Automatic Control and Information Technology, Faculty of Electrical Engineering and Computer Science, Cracow University of TechnologyThe subject of this paper is the inventory-production problem, which is a one of the optimization problems in a decision area in which inventory volume and production volume are considered together. There are many approaches to this problem but for the first time, this problem is modelled by means of a capacitated graph network and a solution to the problem is proposed on the basis of this model which consists of finding the maximum flow with the minimum sum of production and inventory cost. In this article, only a solution for one kind of product for the deterministic inventory-production optimisation problem is presented and for this one kind of product, a maximum flow with a minimum cost for each considered demand period is calculated. The maximum flow with minimum cost is a solution to the homogenous inventory-production optimisation problem. The solution to the one kind of product for the inventory-production problem consist of maximum flow with minimum cost for a total demand from all periods, which has been taken into consideration.https://doi.org/10.37705/TechTrans/e2020016inventory-production problemoptimisationcapacitated graph network
spellingShingle Schiff Krzysztof
A method for the solution of the homogeneous inventory-production optimisation problem
Technical Transactions
inventory-production problem
optimisation
capacitated graph network
title A method for the solution of the homogeneous inventory-production optimisation problem
title_full A method for the solution of the homogeneous inventory-production optimisation problem
title_fullStr A method for the solution of the homogeneous inventory-production optimisation problem
title_full_unstemmed A method for the solution of the homogeneous inventory-production optimisation problem
title_short A method for the solution of the homogeneous inventory-production optimisation problem
title_sort method for the solution of the homogeneous inventory production optimisation problem
topic inventory-production problem
optimisation
capacitated graph network
url https://doi.org/10.37705/TechTrans/e2020016
work_keys_str_mv AT schiffkrzysztof amethodforthesolutionofthehomogeneousinventoryproductionoptimisationproblem
AT schiffkrzysztof methodforthesolutionofthehomogeneousinventoryproductionoptimisationproblem