Model and Algorithm for a Two-Machine Group Scheduling Problem with Setup and Transportation Time
This paper investigates a two-machine group scheduling problem with sequence-independent setup times and round-trip transportation times, which is derived from the production management requirements of modern steel manufacturing enterprises. The objective is to minimize the makespan. Addressing limi...
Main Authors: | Yu Ni, Shufen Dai, Shuaipeng Yuan, Bailin Wang, Zhuolun Zhang |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2024-03-01
|
Series: | Mathematics |
Subjects: | |
Online Access: | https://www.mdpi.com/2227-7390/12/6/888 |
Similar Items
-
An Iterated Greedy Algorithm for a Parallel Machine Scheduling Problem with Re-entrant and Group Processing Features
by: Shuaipeng Yuan, et al.
Published: (2023-01-01) -
Flow shop scheduling: theoretical results, algorithms, and applications/
by: Emmons, Hamilton, et al.
Published: (c201) -
Sine-Cosine Algorithm to Enhance Simulated Annealing for Unrelated Parallel Machine Scheduling with Setup Times
by: Hamza Jouhari, et al.
Published: (2019-11-01) -
A TWO-STAGE GREEDY HEURISTIC FOR A FLOWSHOP SCHEDULING PROBLEM UNDER TIME-OF-USE ELECTRICITY TARIFFS
by: Amir Ebrahimzadeh Pilerood, et al.
Published: (2018-05-01) -
A Hybrid Heuristic Algorithm for the Intelligent Transportation Scheduling Problem of the BRT System
by: Ning Zheng, et al.
Published: (2015-12-01)