Equivalence Analysis of LCOE and IRR for New Energy Projects

[Introduction] With the development of domestic renewable energy industry, the recession of governmental subsidies and the implementation of policies such as competitive allocation of resources, Levelized Cost of Energy (LCOE) is gaining more and more attention and application, but its calculation m...

Full description

Bibliographic Details
Main Authors: Dongjie WANG, Binsi LI, Sikai ZHOU
Format: Article
Language:English
Published: Energy Observer Magazine Co., Ltd. 2023-03-01
Series:南方能源建设
Subjects:
Online Access:https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2023.02.014
_version_ 1797857849409273856
author Dongjie WANG
Binsi LI
Sikai ZHOU
author_facet Dongjie WANG
Binsi LI
Sikai ZHOU
author_sort Dongjie WANG
collection DOAJ
description [Introduction] With the development of domestic renewable energy industry, the recession of governmental subsidies and the implementation of policies such as competitive allocation of resources, Levelized Cost of Energy (LCOE) is gaining more and more attention and application, but its calculation method is inconsistent in domestic energy industry. In this paper, the relationship between Internal Rate of Return (IRR) and LCOE is analyzed to improve understanding of LCOE and standardize its application. [Method] The characteristics and application scenarios of LCOE and IRR were analyzed, and then their calculation formulas were simplified and transformed to analyze the difference and relation between them in models. Finally through the case analysis of an offshore wind power plant, the actual difference between the results was calculated, and the factors causing the difference and their sensitivities were analyzed. [Result] From the perspective of results, the simplified calculation models are very similar except for the income tax. According to the case analysis, the factors causing the difference between IRR and LCOE include the VAT deduction, after-tax incentives of VAT and income tax, additional taxes, and financing during the construction period, and influenced different directions to different extent. It can be considered that IRR and LCOE are similar in principle, but they become different under the influence of domestic fiscal policy, tax system and increased boundary conditions. [Conclusion] It is suggested that LCOE is properly localized and revised by competent departments, industry associations, etc. In combination with environmental impact costs and power system impact costs, the economy of different power generation approaches can be compared, and the rapid comparison of the economy of different schemes can also be achieved in specific projects.
first_indexed 2024-04-09T21:03:28Z
format Article
id doaj.art-d315ef53daee4222bcfbd4ed096ebad0
institution Directory Open Access Journal
issn 2095-8676
language English
last_indexed 2024-04-09T21:03:28Z
publishDate 2023-03-01
publisher Energy Observer Magazine Co., Ltd.
record_format Article
series 南方能源建设
spelling doaj.art-d315ef53daee4222bcfbd4ed096ebad02023-03-29T06:06:26ZengEnergy Observer Magazine Co., Ltd.南方能源建设2095-86762023-03-0110210110910.16516/j.gedi.issn2095-8676.2023.02.0142022-077Equivalence Analysis of LCOE and IRR for New Energy ProjectsDongjie WANG0Binsi LI1Sikai ZHOU2China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd., Guangzhou 510663, Guangdong, ChinaChina Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd., Guangzhou 510663, Guangdong, ChinaChina Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd., Guangzhou 510663, Guangdong, China[Introduction] With the development of domestic renewable energy industry, the recession of governmental subsidies and the implementation of policies such as competitive allocation of resources, Levelized Cost of Energy (LCOE) is gaining more and more attention and application, but its calculation method is inconsistent in domestic energy industry. In this paper, the relationship between Internal Rate of Return (IRR) and LCOE is analyzed to improve understanding of LCOE and standardize its application. [Method] The characteristics and application scenarios of LCOE and IRR were analyzed, and then their calculation formulas were simplified and transformed to analyze the difference and relation between them in models. Finally through the case analysis of an offshore wind power plant, the actual difference between the results was calculated, and the factors causing the difference and their sensitivities were analyzed. [Result] From the perspective of results, the simplified calculation models are very similar except for the income tax. According to the case analysis, the factors causing the difference between IRR and LCOE include the VAT deduction, after-tax incentives of VAT and income tax, additional taxes, and financing during the construction period, and influenced different directions to different extent. It can be considered that IRR and LCOE are similar in principle, but they become different under the influence of domestic fiscal policy, tax system and increased boundary conditions. [Conclusion] It is suggested that LCOE is properly localized and revised by competent departments, industry associations, etc. In combination with environmental impact costs and power system impact costs, the economy of different power generation approaches can be compared, and the rapid comparison of the economy of different schemes can also be achieved in specific projects.https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2023.02.014levelized cost of energy (lcoe)electricity price modelinternal rate of return (irr)sensitivity analysiseconomic index
spellingShingle Dongjie WANG
Binsi LI
Sikai ZHOU
Equivalence Analysis of LCOE and IRR for New Energy Projects
南方能源建设
levelized cost of energy (lcoe)
electricity price model
internal rate of return (irr)
sensitivity analysis
economic index
title Equivalence Analysis of LCOE and IRR for New Energy Projects
title_full Equivalence Analysis of LCOE and IRR for New Energy Projects
title_fullStr Equivalence Analysis of LCOE and IRR for New Energy Projects
title_full_unstemmed Equivalence Analysis of LCOE and IRR for New Energy Projects
title_short Equivalence Analysis of LCOE and IRR for New Energy Projects
title_sort equivalence analysis of lcoe and irr for new energy projects
topic levelized cost of energy (lcoe)
electricity price model
internal rate of return (irr)
sensitivity analysis
economic index
url https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2023.02.014
work_keys_str_mv AT dongjiewang equivalenceanalysisoflcoeandirrfornewenergyprojects
AT binsili equivalenceanalysisoflcoeandirrfornewenergyprojects
AT sikaizhou equivalenceanalysisoflcoeandirrfornewenergyprojects